Installation
RTCSmp Built-In Temperature Controlled Hold-Line
14
Part # 4532286 Rev 3 (6/10/14)
3.
Center the unit within the cut-out.
4.
Level and press the flange into the silicone at the
same time. Ensure both the countertop and the
hob(s) are leveled.
5.
To provide a water tight seal, apply silicone
adhesive completely around, filling any gaps
between the unit and the counter-top surface.
Carefully wipe up any excess silicone.
4.5.2
Control Unit Installation
The induction unit comes with up to two complete control units. The cable provided for each control is 118”
(3000mm) long. There are No Green Indicator Lights on the control units for the RTCSmp Hold-Line models.
NOTE
Install the control units
VERTICALLY
on the cabinet panel. There are two methods to install a control
unit: front-mount or back-mount onto the panel.
Installers are responsible for choosing the appropriate fasteners for the installation.
4.5.2.1
Dimensions: Control Unit RTCSmp HOIN450/900/1350/1800
(Measurements in mm and [inch]. CAN/BUS denotes the potentiometer connection.)