G1000 / GFC 700 System Maintenance Manual - 300/B300 Series King Air
Page 3-49
190-00716-01
Revision 1
3.36 Splash Screen Loading
When all software and configuration has been loaded, the splash screens must be loaded to all display
units (PFD1, PFD2 and MFD).
1.
If not applied, apply power to the G1000 system.
2.
Remove power from PFD1, PFD2 and MFD by opening the PFD1 PRI/SEC, PFD2 and MFD
circuit breakers.
3.
Insert the software loader card in the upper slot of PFD2.
4.
Apply power to PFD2.
5.
When prompted to update system files, press the NO softkey.
6.
When prompted to update splash screen files, press the YES softkey.
7.
Remove the loader card from PFD2 and insert it into the upper slot of the MFD.
8.
Apply power to the MFD and repeat steps 5 and 6.
9.
Remove the loader card from the MFD and insert it into the upper slot of PFD1.
10.
Apply power to PFD1 and repeat steps 5 and 6.
11.
Cycle power to the MFD and splash screen will be present.
NOTE
Any time software and/or configuration is loaded to the system, the splash
screens may need to be reloaded to all three display units.
Summary of Contents for Cessna Caravan G1000
Page 2: ...This page intentionally left blank...
Page 89: ......