____________________________________________________________________
G1000 System Maintenance Manual
Page 10-7
190-00903-00
Rev.
A
10.6 SYSTEM COMMUNICATION HIERARCHY
The following criteria must be satisfied to be able to perform these desired options:
Desired Operation
Requirements
Load Software to GDU 1xxx MFD or PFD
Displays
a.
G1000 SW Loader Card must be inserted in
top slot for each display to be loaded.
b.
CLR & ENT keys must be held during power
up of display.
c.
Power only one display on at a time during
software loading.
Load AIRFRAME, SYSTEM, MFD1, PFD1, and
MANIFEST configuration files to the MFD and
PFD
a.
G1000 SW Loader Card must be inserted in
top slot of the PFD.
b.
PFD and MFD must be powered on.
c.
PFD and MFD must have correct software.
Load Software/Configuration files to GIA 63/GIA
63Ws
a.
G1000 SW Loader Card must be inserted in
top slot of the PFD.
b.
G1000 system must be powered on.
c.
PFD and MFD must have correct software.
d.
PFD and MFD must be successfully
configured with AIRFRAME, SYSTEM, MFD1,
and PFD1 configuration files.
Load Software/Configuration files to:
- GMA 1347
- GDC 74A
- GEA 71
- GRS 77 (software only)
- GMU 44 (software only)
- GTX 33
- GDL 69A
a.
G1000 must be powered on.
b.
Airframe specific card loader must be inserted
into PFD top slot.
c.
PFD and MFD must have correct software
and configuration settings.
d.
GIA 63/GIA 63Ws must have correct
software.
e.
GIA 63/GIA 63Ws must be successfully
configured with GIA1 and GIA2 configuration
files.
f.
Data path from GIA1 to each LRU must be
operational.