______________________________________________________________________________
____________________________________________________________________________
LMM for the Kodiak 100
Page 3-21
190-02102-00 Rev.4
Figure 3-14. Upload Complete Confirmation
13. View the SUMMARY field and ensure the loaded items are COMPLETED.
14. Repeat Step 1 through Step 13 to load any other desired options requiring an
enable card.
15. De-activate the cursor.
16. Power down the system and remove the enablement card from PFD1.
3.8 Crossfill Monitoring System
After a configuration file upload to an MFD or PFD is complete, it has only been verified
on PFD1, and not on any other device. If the technician powers down the devices before
the configuration has been sent to the other devices on the crossfill network, it is possible
the other devices may not have received the entire configuration. When these devices
are powered on with missing or invalid configuration, they may revert to a default, safe
configuration, and then that new configuration will be cross filled to the other devices
(including the original device that has the correct configuration), erasing the uploaded
configuration. The Crossfill Monitoring System prevents that from happening by waiting
until crossfill has completed to declare the upload complete, at which point it is safe to
power down the devices.
While the Crossfill Monitor is waiting for crossfill to complete, a progress bar displays the
percentage of the 10-minute timeout that has elapsed. This bar does not display the
crossfill progress. When crossfill is complete, the bar will be set to 100%, the Crossfill
Monitor will display a message to the technician indicating the upload is complete, and
the OK button will appear, concluding the upload process.
Uncontrolled if Printed
Summary of Contents for Cessna Caravan G1000
Page 2: ...BLANK PAGE Uncontrolled if Printed...
Page 288: ...Uncontrolled if Printed...