8
Introduction
Installing the Batteries
The eTrex Summit operates on two AA batteries (not
included), which are installed at the back of the unit.
To install the batteries, remove the battery cover by turn-
ing the D-ring at the back of the unit 1/4 turn counter-
clockwise. Insert the batteries observing proper polarity.
Attach the battery cover by turning the D-ring 1/4 turn
clockwise. The two AA batteries can last up to 16 hours
during typical use.
D-ring
Battery Cover
Battery
Installation
Lanyard Installation
190-00193-00_0D.indd
02/12/01, 10:08 AM
8