190-01115-01
G3X/G3X Touch Installation Manual - GTP 59 Installation
Rev. AC
Page 20-5
20.5 Outline and Installation Drawings
Figure 20-2. GTP 59 O.A. T. Probe Installation Drawing
NOTES:
2. BUBBLE NUMBERS IN THIS DRAWING REFER TO REFERENCE NUMBERS LISTED IN TABLE 20-3.
1. SUPPLIED CABLE LENGTH IS 10’ +/- 6”. CABLE MAY BE CUT TO NEEDED LENGTH OR LENGTHENED
UP TO 25’ (15’ ADDITIONAL) AS NEEDED. USE THREE-WIRE TWISTED SHIELDED CABLING AND HIGH
QUALITY CRIMPED OR SOLDERED CONNECTIONS FROM THE PROBE TO THE EXTENSION WIRE.
SEE NOTE 1