Post-Installation Configuration & Checkout
GNS 480 (CNX80) Installation Manual
560-0982-01 Rev L
3-1
3
Post Installation Configuration & Checkout Procedures
Once the GNS 480 unit has been installed, configure the unit for the particular installation and then
complete the checkout procedures herein to verify proper operation. The steps that are not applicable to a
particular installation may be skipped. A checkout log sheet is included in Table 3-7 on page 3-45, to be
filled out during the checkout procedure. The completed checkout log sheet should be maintained with
the aircraft permanent records.
3.1
Mounting and Wiring Check
Verify that all cables are properly secured and shields are connected as the install drawings indicate.
Installation may require that you check the movement of the aircraft controls to verify that there is no
interference.
Summary of Contents for GNS 480
Page 1: ...GNS 480 CNX80 Color GPS NAV COM Installation Manual November 2008 560 0982 01 Rev L...
Page 10: ...Table of Contents viii 560 0982 01 Rev L GNS 480 CNX80 Installation Manual Notes...
Page 32: ...General Information 1 22 560 0982 01 Rev L GNS 480 CNX80 Installation Manual Notes...
Page 80: ...Installation Procedures 2 48 560 0982 01 Rev L GNS 480 CNX80 Installation Manual Notes...
Page 134: ...Periodic Maintenance 6 2 560 0982 01 Rev L GNS 480 CNX80 Installation Manual Notes...
Page 158: ...Appendix D Interconnect Diagrams D 2 560 0982 01 Rev L GNS 480 CNX80 Installation Manual Notes...
Page 192: ...D 36 560 0982 01 Rev Notes...
Page 199: ......
Page 200: ......