190-02207-A2
GPS 175/GNX 375/GNC 355 Part 23 AML STC Maintenance Manual
Rev. 3
Page 4-7
4.6 Overhaul Period
The system does not require overhaul at a specific time period. Power on self-test and BIT will monitor the
health of the GPS 175/GNX 375/GNC 355 system. If any LRU indicates an internal failure, the unit may
be removed and replaced. Refer to Section 5 of this document for fault corrective actions.
4.7 Additional Instructions
None.