190-01639-00
GSU 75 ADAHRS Installation Manual
Rev. 6
Page iv
TABLE OF CONTENTS
PARAGRAPH
PAGE
Section 1 GENERAL DESCRIPTION .............................................................1-1
1.1 Introduction...................................................................................................................... 1-1
1.2 Equipment Description .................................................................................................... 1-2
1.3 Interface Summary........................................................................................................... 1-3
1.4 Technical Specifications .................................................................................................. 1-3
1.5 Certification ..................................................................................................................... 1-6
1.6 Operating Instructions...................................................................................................... 1-8
1.7 Reference Documentation................................................................................................ 1-8
Section 2 INSTALLATION OVERVIEW........................................................2-1
2.1 Introduction...................................................................................................................... 2-1
2.2 Installation Materials ....................................................................................................... 2-1
2.3 Equipment Available ....................................................................................................... 2-2
2.4 Additional Equipment Required ...................................................................................... 2-3
2.5 Cabling and Wiring.......................................................................................................... 2-3
2.6 Electrical Bonding ........................................................................................................... 2-3
2.7 Pneumatic Plumbing ........................................................................................................ 2-4
2.8 Cooling Air ...................................................................................................................... 2-4
2.9 GTP 59 Icing.................................................................................................................... 2-4
2.10 Installation Approval Considerations for Pressurized Aircraft...................................... 2-5
2.11 Mounting Requirements ................................................................................................ 2-6
Section 3 INSTALLATION PROCEDURE.....................................................3-1
3.1 Unpacking Unit................................................................................................................ 3-1
3.2 Wiring Harness Installation ............................................................................................. 3-1
3.3 Backshell Assembly and Installation............................................................................... 3-3
3.4 GSU 75/GMU 44 Interconnect Harness Fabrication Instructions ................................... 3-3
3.5 GSU 75/GTP 59 Interconnect Harness Fabrication Instructions..................................... 3-4
3.6 Pneumatic Connections.................................................................................................... 3-8
3.7 Mounting Instructions...................................................................................................... 3-9
3.8 Post Installation Configuration and Checkout ............................................................... 3-11
3.9 Continued Airworthiness ............................................................................................... 3-11
Section 4 SYSTEM INTERCONNECTS..........................................................4-1
4.1 Pin Function List.............................................................................................................. 4-1
4.2 Power Functions .............................................................................................................. 4-4
4.3 Data Interfaces ................................................................................................................. 4-5
4.4 GSU 75 Discrete Inputs ................................................................................................... 4-7
4.5 GSU 75 OAT (Outside Air Temperature) Probe ............................................................. 4-8
4.6 GSU 75 PPS (Pulse Per Second) Inputs .......................................................................... 4-8
4.7 GSU 75 ARINC 429 System ID Connections ................................................................. 4-9
340095
The document reference is online, please check the correspondence between the online documentation and the printed version.