Each LS4 station is pre-programmed from factory and 
tested according to the specification from customer. There 
is no need for any programming or setup by installer 
during installation. 

Plan the installation site carefully so that the risk of being 
hit by vehicles is minimized.

Each LS4 station is individually marked with a unique 
“M-number” so that the installer can identify each LS4 
station. The M-number label is located at upper right 
hand side corner behind the front door. When contacting 
GARO support, please have the M-number available.

LS4 stations that are pre-configurated for backend-
solution have the ChargeBoxID (CBID) labeled under the 
M-number label.

GENERAL INFORMATION

Manual

LS4

Keys

Cable holder

2 x

INFORMATION

CONTENT

Incorrect installation and testing of the LS4 could 
potentially damage either the vehicle and/or the LS4 
itself.

Poor quality electricity may harm the LS4 and or the 
vehicle. An example of such source of poor quality 
electricity may be private power generators.

Do not operate the LS4 in temperatures outside its 
operating range – see technical specifications.

CAUTIONS

4

EN

Summary of Contents for LS4 43kW

Page 1: ...GARO LS4 43kW Installation Manual EN GARO AB Box 203 SE 335 25 Gnosj Phone 46 0 370 33 28 00 info garo se garo se Manual 380316 1 0 EN...

Page 2: ...utions 4 General Information 4 Content 4 INSTALLATION 5 NORMAL USE 9 Electrical diagram 14 Technical specifications 17 Service information 17 Form for annual service and maintenance 18 Warranty Condit...

Page 3: ...FETY INFORMATION The LS4 stations are designed exclusively for charging electric vehicles All installation must be carried out by an authorized installer and comply with local country installation reg...

Page 4: ...er behind the front door When contacting GARO support please have the M number available LS4 stations that are pre configurated for backend solution have the ChargeBoxID CBID labeled under the M numbe...

Page 5: ...the provided ethernet router switch located ie in the LS4 master Se example of ethernet wiring diagram picture 6 7 In cases with LS4 stations connected in a grid installation of the LS4 stations need...

Page 6: ...picture 1 picture 2 Cu 2 5Nm Al 4Nm OPTION INSTALLATION CU AL 6 EN...

Page 7: ...0 8Nm 0 05 picture 3 picture 4 picture 5 INSTALLATION 7 EN...

Page 8: ...P CAT6 cable to router switch 5pcs LS4 connected with TP CAT6 cable to router switch picture 6 picture 7 Example of DLM meter installation Modbus address 2 9600 8 1 no parity Terminals 200 A 201 B DLM...

Page 9: ...ing station have received command from backend to start charging and is waiting for car to connect Firm Car connected Charging is ongoing state C Car connected Charging is paused state B Blinking When...

Page 10: ...g without success Contact installer or GARO Support please have M number available Check car settings that can influence charging i e gear in parking mode doors closed car locked etc Present a valid R...

Page 11: ...kend charger configuration OperatorCurrentLimit Check motor locking wiring and connection for damages Verify that locking mechanism rod and arm are not stuck Verify that the connector is properly inse...

Page 12: ...black cables were disconnected then it has deteced an earth fault in one of the DC powered components controllers upper PCB router switch etc inside the charging station If LED light DC OK remains tu...

Page 13: ...Vehicle not connected Firm CHARGING occupied C Vehicle connected ready CHARGING suspendedEV B Vehicle connected not ready Blinking Reserved Firm RCD triggered groundFailure Residual current detected...

Page 14: ...XN1 Neutral Terminal Block QA1 Contactor XPE1 Protection Earth Terminal Block 1 XPE2 Protection Earth Terminal Block 2 CT1 Current transformer 100A CT2 Current transformer 100A CT3 Current transforme...

Page 15: ...CT3 XPE2 XPE1 P1 CC1 A MOD CC1 B MOD AC Terminal 35 Feritte 525 Ohm DOUBLE INSULATED CABLE 16 1 5 XN1 L N EB1 Heater Cold Option 10A FC3 I 2 1 P1 11 P1 11 XD1 CP 201 200 External Energy Meter A1 A2 Q...

Page 16: ...o t o M Motor HS1 Relais 13 Motor HS2 Relais 14 GND2 Modbus B2 Modbus A2 Modbus WA Relais 23 WA Relais 24 RJ45 CC1 Down Side 0V 12V DC Terminal A1 A2 K3 OUT IN OUT IN CC RFID 12V GND HEAT Top Card KF1...

Page 17: ...ID output power 250mW SERVICE INFORMATION Care and maintenance GARO charging station LS4 The warranty will only remain valid if service is performed Service is performed once a year and must be docume...

Page 18: ...cation by 2 or 3 flashes from LED s Turn off the electrical power Check gaskets Check torque for mains terminals Check torque for LS4 fixing screws towards ground wall Check torque on standard compone...

Page 19: ...l number 7 Warranty does not cover damage occurred by incorrect use of equipment use of any non original spare parts lack of maintenance or faults caused by disassembly of the product or unauthorized...

Page 20: ...ANTIFORMUL R LS4 Model M no Electrical installation data Group fuse A Supply cable dimension Function Test Testbox EV model Date Sign Installer Company Name Owner Customer Name Installation adress WAR...

Page 21: ...DECLARATION OF CONFORMITY 21 EN...

Page 22: ...GARO AB Box 203 SE 335 25 Gnosj Phone 46 0 370 33 28 00 info garo se garo se EN...

Reviews: