© ANITA
MP02800EN_180319
19
5
MAINTENACE
5.1 CLEANING AND CHECKING
Maintenance operation
Maintenance interval
Throat plate (1) disassembly. Cleaning of throat plate, hook (2),
feed dog (3) and their surroundings.It is possible to clean with
compressed air.
Re-lubrication of hook path with oil and washing of dirt out of the
path. Spraying the unnecessary oil out of the hook at the machine
high speed operation.
Check of oil reserve in oil tanks (see section 10.2).
1 week
Cleaning of mechanisms in the base plate. Cleaning (vacuuming,
wiping out) 1 month
oil tray. Cleaning of ventilator grid on the motor.
1 month
Check of bobbin case (4) fitting clearance in the hook housing (5).
Check of drive V-belt tension (checking method is described
in the second part of this Instruction for Use). Lubrication of
swinging shafts
with grease (see section 10.2).
1 year
3
1
5
2
4
www.garudan.cz
Summary of Contents for GZ-5527-443
Page 21: ......