GASBOY Series 1000
27-6
05/29/03
Figure 27-5. Ribbon Installation Sequence
Installing New Ribbon Spools
1. Place the ribbon spool onto the left shaft with the spool-driving pins pointing toward the
printer (Figure 27-5 C).
2.
Feed the ribbon over the left ribbon guide, under the print head, and over the right ribbon
guide.
3.
Repeat Step 1 for the right spool.
4.
Rotate both spools to remove the slack from the ribbon.
5.
Return the paper cutter unit to the normal position and slide the cutter latch to the left to lock
(Figure 27-5 A).
6.
Perform a short self-test
7.
Return the printer slide assembly to its normal position and lock it in place with the hex head
screw.
8.
Close and lock the printer access door.
NOTE:
Make sure the printer door lock is drawn tight in order to insure a watertight seal.
Summary of Contents for SERIES 1000
Page 1: ...SERIES 1000 FUEL MANAGEMENT SYSTEM OPERATION MANUAL FOR CANADA C08948 GASBOY INTERNATIONAL LLC...
Page 2: ......
Page 12: ......
Page 26: ......
Page 32: ......
Page 60: ......
Page 94: ......
Page 100: ......
Page 104: ......
Page 110: ......
Page 112: ......
Page 128: ......
Page 142: ......
Page 146: ......
Page 148: ......
Page 172: ......
Page 180: ......
Page 204: ......
Page 210: ......
Page 212: ......
Page 240: ......