background image

6

7

6

6

ASSEMBLY INSTRUcTIONS

Note:  Remove any transit protection material.

Tools required

Adjustable spanner.

Step 1

1-1. 

Put the 3 post brackets on each position on  

 

the base as shown in the picture.

1-2. 

Use 3 M8 x 16mm bolts to join the post  

 

brackets and base.

Step 2

2-1. 

Put the base post on the top of 3 post  

 brackets.
2-2. 

Use 6 M6 x35mm bolts and nuts to    

connect the post to the post brackets. 

 

Tighten the bolts and nuts.
2-3. 

Fill the plastic container in the base with  

 sand.
2-4. 

Attach the top post using 4M6 screws.

Step 3

Place the cylinder housing on the stand.

Step 4

4-1. 

Secure the 3 90mm pins (reflector support  

 

bolts) on the cap of flame screen.

4-2. 

Route the gas hose up through the post  

 

and out of the top.

4-3. 

Connect the gas hose to the gas burner  

 

inlet connector.

4-4. 

Connect the regulator to the hose and a  

 

gas cylinder and leak test both of the    

connections using a soapy water solution.
4-5. 

Attach the completed burner to the post  

 

with 4 M6 x 10mm bolts.

Step 5

5-1. 

Place a washer on each reflector support  

 bolt.
5-2. 

Fasten the reflector with 3 washers and 3  

 

M8 castle nuts.

1

2

3

4

5

Summary of Contents for PH2160

Page 1: ...njury or property damage Read the instructions thoroughly before installing or servicing this equipment PATIO HEATER Model No PH2160 PH2165 PH2169 The ideal solution for extending the season for outdoor entertaining Direct ignition Maximum output 40MJ h Adjustable heat output Operates for approximately 9 hours on a properly filled 9Kg propane cylinder Includes a safety tip over switch that halts s...

Page 2: ...arance around air openings into the combustion chamber clearances from combustible materials provisions for accessibility and for combustion and ventilating air supply must be maintained at all times when the appliance is operating 3 Proper clearance from combustible materials must be maintained at all times The minimum clearances are as follows Minimum Clearance from Combustibles Side 500mm Rear ...

Page 3: ...age and Handling of Liquefied Petroleum Gases 10 This heater is designed to operate with a standard 9Kg propane cylinder with Approved Cylinder Connection 11 The valve outlet must be maintained in good condition When the cylinder is not in use be sure to cover it with a dust cap A leak test should be performed with soapy water whenever connecting a new cylinder NEVER use a match to test for leaks ...

Page 4: ...ce from Combustible Surfaces Combustible materials are considered to be wood compressed paper plant fibres plastic or other materials that are capable of being ignited and burned 2130mm Hose connection point 1600mm 440mm Cylinder housing 750mm Burner head ...

Page 5: ...TOR ASSEMBLY 1 Place the 3 parts of reflector segments to overlap together and attach with 3 screws washers and nuts 2 Place round part of reflector over the 3 segments and attach with 6 screws washers and nuts ...

Page 6: ...ainer in the base with sand 2 4 Attach the top post using 4M6 screws Step 3 Place the cylinder housing on the stand Step 4 4 1 Secure the 3 90mm pins reflector support bolts on the cap of flame screen 4 2 Route the gas hose up through the post and out of the top 4 3 Connect the gas hose to the gas burner inlet connector 4 4 Connect the regulator to the hose and a gas cylinder and leak test both of...

Page 7: ...void any warranty claims Read the installation operating and maintenance instructions thoroughly before installing or servicing this equipment WARNING LIGHTING INSTRUCTIONS Step 1 Ensure that the control knob is off Slowly open the gas cylinder valve Step 2 Push in control knob and turn anti clockwise to HIGH whilst simultaneously pushing the ignitor button several times Step 3 Check for flame at ...

Page 8: ... see Example 1 Within a partial enclosure that includes an overhead cover and no more than two walls see Example 2 3 Within a partial enclosure that includes an overhead cover and more than two walls the following will apply at least 25 of the total wall area is completely open and at least 30 of the remaining wall area is open and unrestricted see Example 4 5 In the case of balconies at least 20 ...

Reviews: