Table of Contents
Table of Contents
2
IMPORTANT
When carrying out commissioning of the boiler, you are highly recommended to perform the following checks:
– Make sure that there are no liquids or inflammable materials in the immediate vicinity of the boiler.
– Make sure that the electrical connections have been made correctly and the earth wire is connected to a
weel done earthing system.
– Open the gas tap and check the soundness of the connections, including the burner.
– Make sure that the boiler is set for operation for the type of gas supplied.
– Check that the flue pipe for the outlet of the products of the combustion is unobstructed and has been properly
installed.
– Make sure that any shutoff valves are open and dirt seperators are installed on the return water connection.
– Make sure that the system is charged with water and is thoroughly vented.
– Check that the circulation pump is not locked.
– Purge the system, bleeding off the air present in the gas pipe by operating the pressure relief valve on the gas
valve inlet.
– The installer must provide the user with instruction in operation of the boiler and safety devices and hand over the
instruction booklet to the user.
–
The images shown in this manual are a simplified representation of the product. In this representation there may be
slight, unimportant differences with the supplied product.
1 Meaning of the symbols and safety instructions . . 3
1.1
Meaning of symbols
1.2
General warnings
2 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.1
Designated use . . . . . . . . . . . . . . . . . . . . . 5
2.3
. . . . . 5
Boiler room & ventilation. . . . . . . . . .
2.2
Description of the appliance . . . . . . . . . . 5
. . . . . . . . . . . . . . . . . . 3
. . . . . . . . . . . . . . . . . . . 3
1.3
Safety instructions . . . . . . . . . . . . . . . . . . . 4
1.4
Regulations and standarts
. . . . . . . . . . . . 4
2.4
Packaging label . . . . . . . . . . . . . . . . . . . . . 6
2.5
. . . . . . . . . . . . . . . . . . . . . . 6
Warning label
2.6
Data label . . . . . . . . . . . . . . . . . . . . . . . . . 6
3.1
Wallcon 42/50/67 dimensions . . . . . . . . . 7
3.2
. . . . 8
Wallcon 42/50/67 hydraulic diagram
3.3 Wallcon 42/50/67 main components . . . . . . . 9
3 Technical features . . . . . . . . . . . . . . . . . . . . . . . . 7
3.4 Technical data . . . . . . . . . . . . . . . . . . . . . .. 10
4.1.1 Packing
. . . . . . . . . . . . . . . . . . . . . . . . 11
4 Instructions for the installer . . . . . . . . . . . . . . . . . . . 11
4.1
. . . . . . . . . . . . . . . . . . . . . . . . 11
Installation
4.1.2 Transport
. . . . . . . . . . . . . . . . . . . . . . 11
4.1.3 Mounting
. . . . . . . . . . . . . . . . . . . . . . . 11
4.1.4 Clearances
. . . . . . . . . . . . . . . . . . . . . 12
4.1.6 Water side connections
. . . . . . . . . . . . 13
4.1.5 Water quality and treatment
. . . . . . . . . 12
4.1.7 Expansion vessel
. . . . . . . . . . . . . . . . . 13
4.1.8 Safety valve
. . . . . . . . . . . . . . . . . . . . 13
4.1.9 Condansate drain
. . . . . . . . . . . . . . . . 13
4.1.10 Frost protection
. . . . . . . . . . . . . . . . . 13
4.1.11 Dirt seperation
. . . . . . . . . . . . . . . . . . 13
4.1.13 Pump
. . . . . . . . . . . . . . . . . . . . . . . . . 13
4.1.12 Automatic air vent
. . . . . . . . . . . . . . . . 13
4.2 Installation examples
. . . . . . . . . . . . . . . . 14
4.2.1 Single boiler installations
. . . . . . . . . . . 14
4.2.2 Cascade installation
. . . . . . . . . . . . . . . . 15
4.3 Adjustment of the gas rate
. . . . . . . . . . . 16
4.3.1 Description of the adjustment points
. . . 16
4.3.2 Combustion values adjustment table
. . . 16
4.3.3 Maximum output adjustment
. . . . . . . . . 16
4.3.4 Minimum output adjustment
. . . . . . . . . 17
4.4 Gas conversion instructions
. . . . . . . . . . . 18
4.5 Flue installation instructions
. . . . . . . . . . . 19
4.5.1 Flue appliance types
. . . . . . . . . . . . . . . 19
4.5.2 Flue installation types
. . . . . . . . . . . . . . 20
4.5.3 Flue kit accesories
. . . . . . . . . . . . . . . . . 21
4.6 Electrical installation
. . . . . . . . . . . . . . . . 22
4.6.1 Wiring diagram
. . . . . . . . . . . . . . . . . . . . 22
4.6.2 External probe installation
. . . . . . . . . . 23
4.6.3 Outdoor temperature control
. . . . . . . . 24
5 Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
5.1 General
. . . . . . . . . . . . . . . . . . . . . . . . . . 25
5.2 Programming
. . . . . . . . . . . . . . . . . . . . . 27
5.3 Error codes
. . . . . . . . . . . . . . . . . . . . . . 28
5.4 Maintenance codes
. . . . . . . . . . . . . . . . 29
6 Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
6.1 General
. . . . . . . . . . . . . . . . . . . . . . . . . . 30
Comissioning checklist
. . . . . . . . . . . . . . . . . . 34
6.2 Maintenance procedure
. . . . . . . . . . . . . 30
Service interval record
. . . . . . . . . . . . . . . . . . 37
6.3 Troubleshooting
. . . . . . . . . . . . . . . . . . . 32