background image

2

ASSEMBLY INSTRUCTIONS 

1.    Add to H sections that will be more than 22” from post base to deck height. 

  

Note:   To be used with post units from other kits. R100, R242, R342, R442

       Slide out the adjustable post support and insert leg attachment (W) into post (A).

       Using  1” PFH screw (CC), adjust height and secure.

Hardware Used

CC

1

Screw, #8-18 x 1” PFH #2 Tek  x 1

For full assembly and installation instructions, see the manual included with the 

R100 Bottom Run or visit www.lowes.com/ramps.

Reviews: