background image

NanoAAB  

User Guide

- 6 -

II. Installation

 

To  install  the  NanoAAB  into  a  standard  AEG,  we  must  access  the  trigger

 

contacts.  In  the  case  of  Version  2  gearboxes,  the  contacts  are  located  inside  the 
gearbox. With a Version 3 gearbox, installation will be easier because the contacts are 
on the outsideof the gearbox. Please consult a local airsoft technician if you have never 
disassembled a gearbox before or if you have any installation concerns.

a) Installation of NanoAAB without replacement of wires.

The  method  below  will  detail  how  to  install  the  device  in  the  easiest  manner.  Using 

this method, the original wiring is kept, and the connections are modified. Referencing

 

Fig. 2, de-solder No. 2 wire from one of the trigger contacts and then solder it to the 
No. 1 wire. It does not matter which wire you disconnect from the trigger switches, just 
join 2 together at one terminal.

1

2

3

(Fig. 1 – Standard AEG wiring scheme)

Summary of Contents for NanoAAB

Page 1: ...User Guide NanoAAB Last Update in 2014 03 08 www gatee eu...

Page 2: ...afety Summary KEEP AWAY OF CIRCUIT Device cover must not be removed by user DO NOT SERVICE ALONE Do not attempt any internal service DO NOT OPERATE IN AN EXPLOSIVE ATMOSPHERE Do not operate the device...

Page 3: ...of Contents Notice Safety Summary I Overview II Installation AEG standard installation diagram Installation of NanoAAB without replacement of wires Installation of NanoAAB with replacement of wires I...

Page 4: ...against burn out Active Brake Do you care about realism Would you like to increase the life of the gearbox Does your rifle have such high rate of fire that you are not able to make a single shot Acti...

Page 5: ...of most modern transistors and microcontroller enabled us to create the smallest and most reliable MOSFET in the market WE GUARANTEE that the MOSFET will work with the strongest AEG replicas If you da...

Page 6: ...u have never disassembled a gearbox before or if you have any installation concerns a Installation of NanoAAB without replacement of wires The method below will detail how to install the device in the...

Page 7: ...d system between battery and AEG Don t forget about signal wire Connect it to top pin Fig 2 Connection modification scheme top view b Installation of NanoAAB with replacement of wires Replacing the ex...

Page 8: ...rma 3 The warranty is valid for 12 months from date of purchase 4 Repairs will be made as soon as possible not exceeding 14 working days 5 All repairs and structural modifications made by the purchas...

Reviews: