background image

EM5 ULTRA Setup 

Page 8 

 

 

Insert ULTRA 5 LCD into to Rear Shell  

 

First, connect video and power connectors 

as shown.  Then seat into the rear 

shell.

 

 

Make a visual check to verify the orange o-ring 

is clean and free of any foreign 

matter.  

 

 

Install the front cover.   

 

Tighten fours screws 

as shown in the image below.  Use a cross-pattern, and DO 

NOT OVERTIGHTEN.

 

 

 

 

 

 

 

 

 

Then insert the ULTRA 5 LCD 
into the rear shell. It will mate 
flush. Inspect the o-ring is 
clean.  

Mate the front shell and 
tighten 4 screws.  DO 
NOT overtighten. 

 

 

First, connect 
power and video 
connectors 
here.   

 

 

Summary of Contents for EM5 ULTRA

Page 1: ...Page 1 EM5 ULTRA Underwater Monitor Housing Setup Use and Care Guide...

Page 2: ...c Photos Gates Underwater Products This manual and current revision is available in 8 5 x 11 size and full color at GatesHousings com Gates Underwater Products Inc 13685 Stowe Drive Poway California 9...

Page 3: ...LTRA Setup 6 Preparing the SmallHD ULTRA 5 LCD 6 Secure EM5 ULTRA to Camera Housing 7 Open the Housing Shell 7 Insert ULTRA 5 LCD into to Rear Shell 8 Visual Check 9 Connect to Camera Housing 10 EM5 U...

Page 4: ...luminum shell stainless hardware and reliable mechanical controls Designed specifically for the SmallHD ULTRA 5 LCD to create the smallest most compact and low profile Underwater Monitor housing Brigh...

Page 5: ...attached to EM5 ULTRA Spare Kit Tool Kit O Ring Removal Tool Trim Float Optional Parts Shade Extension s Additional Shade Extensions are stackable and available for purchase Cautions USER RESPONSIBILI...

Page 6: ...he rear connector MENU POWER AUTO RECOVER ON Pages Refer to the ULTRA 5 User Guide for details on the Pages feature The LCD will boot into a default page that must be set as follows With the LCD on na...

Page 7: ...the EM5 ULTRA to a housing Open the Housing Shell Loosen four screws using the 5 32 ball driver These screws are captive and will not remove Refer to the image below Remove the front shell to expose t...

Page 8: ...e orange o ring is clean and free of any foreign matter Install the front cover Tighten fours screws as shown in the image below Use a cross pattern and DO NOT OVERTIGHTEN Then insert the ULTRA 5 LCD...

Page 9: ...Visual Check Inspect the gap where front and rear shells meet Ensure it is even all around Refer to the image below shown in highlight After closing inspect the seal line around the housing It should...

Page 10: ...de the main housing to connect with the camera Connect BNC connector to the camera SDI output and power to an appropriate D Tap output Refer to your Gates housings SU C Guide for more details on speci...

Page 11: ...EM5 ULTRA Setup Page 11 EM5 ULTRA Controls F1 F2 F3 On the front face are F1 F2 F3 assignable controls Refer to SmallHD ULTRA 5 for details F1 F2 F3 Assignable...

Page 12: ...bles is straightforward Referring to the image below use a 9 64 hex tool to remove 4 screws securing the Bulkhead Adapter to the housing shell Carefully remove the cable with bulkhead adapter and repl...

Page 13: ...w GatesHousings com O Ring Care and Maintenance Your Gates EM5 ULTRA has 1 serviceable o ring It is located on the main housing the front shell mates Its color is orange Servicing the o rings is easy...

Page 14: ...Customer Support Should you have any questions about the EM5 ULTRA and its operation please contact Gates at the numbers below Email Customer srvc GatesHousings com Web https www gateshousings com co...

Reviews: