124756 / 6-2014
32
O P E R A T I O N & M A I N T E N A N C E
Storage
Proper rust prevention treatment of equipment before
placing in storage will not only lengthen its life, but will
assist in maintaining optimum performance when put
back into service.
The following list contains suggestions for preparing your
implement for storage.
•
Clean entire machine. Remove all dirt and excessive
grease implement.
•
Check disk over thoroughly for damaged or worn
parts, cracked or broken blades and loose bolts.
•
Wheel bearings should be cleaned and repacked
each year.
•
Grease all zerks on implement.
•
Block up to remove weight from tires.
•
If implement is lowered to the ground, place boards
under blades.
•
Disconnect rods and fully retract the cylinders to
prevent rusting of shafts and subsequent seal
damage. If left extended, coat rods with grease to
prevent corrosion. Remove grease prior to retracting
cylinders.
•
For safety,
do not
store implement with wings folded
up.
•
Clean and place a protective coating of heavy oil or
grease on earth working parts to prevent rusting.
•
Touch-up any spots where paint has been scratched
or worn off.
Summary of Contents for Magnum Coulter Disk
Page 1: ...June 2014 Magnum Coulter Disk 124756 O p e r a t o r s M a n u a l ...
Page 2: ......
Page 4: ......
Page 8: ...124756 6 2014 6 ...
Page 11: ...9 124756 6 2014 S A F E T Y This Page Left Blank Intentionally ...
Page 14: ...124756 6 2014 12 S A F E T Y Safety Decal Location cont d GM00073 6 6 ...
Page 38: ......