System Setup
11
2
System Setup
Setting up the server
Use the instructions in the Gateway 7450R Rackmount Installation Guide that
came with the server to assemble the server.
You should prepare a safe working environment before assembling the server
by following these guidelines:
■
Obtain an adequately rated uninterruptible power supply (UPS). A UPS
protects against AC line spikes, power interruptions, and other power
fluctuations that may damage the server.
■
Protect the server from extreme temperature and humidity. Do not
expose it to direct sunlight, heater ducts, or other heat-generating objects.
■
Route external cables carefully to make sure they do not block air vents
or impede airflow.
■
Make sure that the inlet air temperature within the rack cabinet remains
below the specified limit of 40
° C (104° F).
■
Keep the server away from equipment that generates magnetic fields,
such as unshielded stereo speakers. Even a telephone placed too close to
the server may cause interference.
Important
Keep the boxes and packing material. If you need to send
the server to Gateway for repairs, you must use the original
packaging or your warranty may be voided.
8507328.book Page 11 Thursday, February 15, 2001 11:28 AM
Summary of Contents for 7450R
Page 6: ...iv Gateway 7450R Server System Manual 8507328 book Page iv Thursday February 15 2001 11 28 AM ...
Page 24: ...16 Gateway 7450R Server System Manual 8507328 book Page 16 Thursday February 15 2001 11 28 AM ...
Page 74: ...66 Gateway 7450R Server System Manual 8507328 book Page 66 Thursday February 15 2001 11 28 AM ...
Page 102: ...94 Gateway 7450R Server System Manual 8507328 book Page 94 Thursday February 15 2001 11 28 AM ...