Setting up your server
9
2
System Setup
Setting up your server
Use the instructions on the poster that came with your server to set up your
hardware.
You can improve the safety of your working environment before setting up
your hardware by following these guidelines:
■
Use a clean, flat, and stable surface for your server. Allow at least 12 inches
at the rear of the server for cabling and air circulation.
■
Obtain a grounded (three-prong) AC surge-protected power strip. A
surge-protected power strip helps protect against AC power fluctuations.
■
Protect your server from extreme temperature and humidity. Do not
expose your server to direct sunlight, heater ducts, or other
heat-generating objects.
■
Keep your server away from equipment that generates magnetic fields,
such as unshielded stereo speakers. Even a telephone placed too close to
the server may cause interference.
■
Plug the server into a wall outlet or power strip that is easily accessible.
Important
Keep the server boxes and packing material in case you
need to send the server to Gateway for repairs. If you
return your server in different packaging, your warranty
may be voided.
Summary of Contents for 910 Series
Page 1: ...8508341 Gateway 910 Series System Manual September 2001 ...
Page 6: ...iv Contents ...
Page 22: ...14 System Setup ...
Page 26: ...18 Case Access 7 Lift the back edge of the cover panel then remove the panel from the server ...
Page 28: ...20 Case Access 3 Swing the bezel outward and disengage the bezel from the hinges ...
Page 100: ...92 Troubleshooting ...
Page 112: ...104 Safety Regulatory and Legal Information ...
Page 122: ...114 Reference Data ...