18
www.gateway.com
8
With the front of the server facing you, lift the server and insert it into the cabinet
from the front, then position the disk guides so they fit in the cabinet rails. The
Gateway 975 server is shown as an example.
9
Push the server toward the back of the cabinet until the fronts of the server rails touch
the front cabinet posts.
10
Attach one of the server rails to the front cabinet post using two of the medium screws
and one nut bar, then attach the remaining rail to the other cabinet post. The Gateway
955 server shown as an example.
11
Follow the instructions in
“Installing the bezel” on page 19
to attach both handles
and secure the server into the cabinet.
Warning
Lifting the server and attaching it to the rack is a two-person job. If
needed, use an appropriate lifting device. A fully loaded Gateway
9515 server weighs about 60 lbs. (27.2 kg).
Caution
Screws are required to support the front of the server. You must
support the server while installing or removing the front screws and
while sliding the server on or off the cabinet rails.
Summary of Contents for 9515
Page 1: ...User Guide Gateway 9515 Server ...
Page 15: ...10 www gateway com ...
Page 125: ...120 www gateway com ...
Page 151: ...146 www gateway com ...
Page 177: ...172 www gateway com ...
Page 193: ...188 www gateway com ...
Page 194: ...A MAN 9515 USR GDE R0 12 04 ...