Appendix D – Ventilator Start-Up Inspection and Tests, Page D-2_________________________________
Ventilator Start-Up Inspection and Tests – Cont.
____ Ventilators built in multiple sections the hot water interconnections between sections are
complete.
____ All drain(s) are plumbed to the floor sink or other drain.
____ All ESP Cells are installed and wires hooked up.
____ Fire Extinguishing System installed and certified.