background image

ZZZ-182.41212MR.1216-21.GP.EN.doc       

              WEB VERSION 

      2 

 

DO NOT DESTROY THE BOXES UNTIL COMPLETELY ASSEMBLED 

PLEASE VERIFY THE CONTENT OF EACH BOX AGAINST THE LIST OF PARTS 

12ft x 12ft / 3.66m x 3.66m Solarium

 

Instruction Manual 

IMPORTANT: RETAIN FOR FUTURE REFERENCE, READ CAREFULLY 

 

For  assistance  with  assembly,  installation,  parts,  or  customer  service,  contact  Gazebo  Penguin  Customer 

Service Department at the numbers listed below (English & French, Mon-Fri 8:00 AM to 4:00 PM EST): 

Montreal

: (514) 276-3485                                                                   

Elsewhere in Canada and the US

: 1-800-737-7174 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Consult with  your local  governing authority  /  local municipal  codes  regarding  installation  of  temporary  structures  before 

purchase or assembly. Some jurisdictions may require permits for, or otherwise regulate, installation and use. 

WARNING: 

 For outdoor use. 

 Snow should be regularly cleared from the roof and not allowed to accumulate. 

 Retain your 

proof of purchase

 for warranty purposes. Also keep the 

original boxes

 

    until the installation is complete and correct. 

 The unit may take more than 4 hours and 3 people are required for this assembly. 

PRIOR TO ASSEMBLY: 

 Please don't destroy boxes until completely assembled. 

 The foundation must be level, flat, and solid, such as concrete or asphalt. 

 Keep away from overhead utility lines, tree branches, and other structures. 

 Check for underground pipes or wires if digging or drilling is required. 

 Do not install near roof lines or other structures that could shed snow, ice, or excessive rain run-off onto the roof top. 

 Assemble the structure as close to its final location as possible. 

 It is recommended to wear safety gloves, safety glasses, and hard hats for installation.   

 Do not hang from, climb on, or stand on the structure or roof. 

 Before assembly, read instructions and check that all parts are present in the boxes. If any parts are missing, refer to warranty 

information. 

 

 A 6ft (1.8m) stepladder, Phillips screwdriver, tape measure, level, mallet, and a tarp to place parts on will be required for 

assembly (not included). 

 Remove top protective film from roof panels prior to assembly; DO NOT remove bottom protective film until ready to insert roof 

panels, so as to identify which side is on top. 

ANCHORING INSTRUCTIONS: 

 Proper anchoring of the frame to the base and the wall is required for safety. 

 Any structure not anchored securely has the potential to fly away during high wind causing damage and safety hazard. 

 How the item is anchored, and the hardware and tools required, will vary based upon the set up location and are not provided.   

 Please check with your local hardware store if for the appropriate anchors for your surface. 

 Do not anchor to pavers / pavement slabs because they are not a solid foundation. 

 Periodically check the anchors to ensure they remain secure 

CARE AND MAINTENANCE: 

  In case of a defective or damaged part, or for any other questions concerning the product, please contact the manufacturer 

directly. 

 Please have the parts list and part numbers on hand when ordering or requesting replacement parts. 

ROOF PANELS: 

 Gently clean with an environmentally-friendly soap solution and water using a sponge or washcloth. 

 Do not use abrasive materials, wire brushes, chemicals, harsh cleaners, or bleach. 

 Rinse using a garden hose and air dry. If removed, ensure thoroughly dry prior to storage. 

 Do not use pressure washer. 

STRUCTURE: 

 Gently clean with an environmentally-friendly soap solution and water using a sponge or washcloth. 

 Do not use abrasive materials, wire brushes, chemicals, harsh cleaners, or bleach. 

 Rinse using a garden hose and air dry. 

 Do not use pressure washer. 

  If there are nicks, chips, and/or scratches see the part # of the paint in the parts list to obtain a matching touch-up paint. 

Summary of Contents for 41212MR-12 SAND

Page 1: ...TE 12 X 12 SOLARIUM ASSEMBLY INSTRUCTIONS DO NOT DESTROY THE BOXES UNTIL COMPLETELY ASSEMBLED PLEASE VERIFY THE CONTENT OF EACH BOX AGAINST THE LIST OF PARTS Two or more adults required for assembly Base Dimensions 12 x 12 Largest Dimensions 12 10 x12 10 Overall Height 110 APPROX ...

Page 2: ...tions and check that all parts are present in the boxes If any parts are missing refer to warranty information A 6ft 1 8m stepladder Phillips screwdriver tape measure level mallet and a tarp to place parts on will be required for assembly not included Remove top protective film from roof panels prior to assembly DO NOT remove bottom protective film until ready to insert roof panels so as to identi...

Page 3: ...chaser with the bill In order to properly exercise your warranty please comply with the following Carefully inspect the contents of the carton for missing or damaged components Should you discover damaged or missing parts do not return the product to the place of purchase but contact Gazebo Penguin Customer Service Department at the numbers listed below Montreal 514 276 3485 Elsewhere 1 800 737 71...

Page 4: ... SLIDING DOOR FRAME D 2 2 2 2 17 054 ROOF PANEL Aa 6 4 08 165 12 DOOR LATCH Dd R 1 2 08 130 12 FRAME NEXT TO DOORS extra holes B 2 2 08 169 12 DOOR LATCH Dd L 1 2 08 158 12 SCREW M6 16 Bb 1 108 08 133 12 CONNECTING PIECE E 4 8 08 131 12 SLIDING DOOR C 2 2 08 167 12 SCREW M6X63 5 Ee 1 20 08 161 12 SCREW M6X70 Cc 1 12 08 136 12 DOOR RAIL F 4 2 12 037 12 CAPNUT M5X60 Cc 2 1 12 08 137 12 DOOR RAIL G 4...

Page 5: ...OOR STOPPER H 1 4 17 044 12 RAFTER L 4 4 08 189 12 ACORN NUT Hh 1 1 17 057 ROOF PANEL Ll 6 4 08 139 12 CONNECTING PIECE I 4 8 08 143 12 Top Cap M 1 1 08 193 PLASTIC PLUG Ii 1 20 17 058 ROOF PANEL Mm 5 4 08 140 12 CONNECTING PIECE J 4 8 08 144 12 CENTRAL HUB N 1 1 17 055 ROOF PANEL Jj 5 4 08 134 12 UPPER DOOR RAIL END CAP Nn 1 4 17 043 12 RAFTER K 4 8 17 049 12 COVER FOR RAFTERS O 4 8 ...

Page 6: ... SOLIDIFYING BAR V 1 4 17 051 12 GAP COVER BAR P 1 12 17 070 12 SOLIDIFYING BAR V1 1 4 18 067 12 SOLIDIFYING BAR BRACKET Pp 1 12 12 047 12 SCREW M5X15 Ww 1 12 17 053 12 END CAP R 1 12 17 060 ROOF PANEL Y 6 4 17 046 12 FINISHING BAR S 1 4 08 156 12 SCREW M4 16 Z 1 28 17 048 12 SOLIDIFYING BAR T 1 4 15 125 12 STEEL ANGLE Z2 assembled to rafter 1 4 15 124 12 STEEL ANGLE Z1 assembled to rafter 1 8 NOT...

Page 7: ...R FRAME D 2 2 2 2 17 054 ROOF PANEL Aa 6 4 08 165 32 DOOR LATCH Dd R 1 2 08 130 32 FRAME NEXT TO DOORS extra holes B 2 2 08 169 32 DOOR LATCH Dd L 1 2 08 158 32 SCREW M6 16 Bb 1 108 08 133 32 CONNECTING PIECE E 4 8 08 131 32 SLIDING DOOR C 2 2 08 167 32 SCREW M6X63 5 Ee 1 20 08 161 32 SCREW M6X70 Cc 1 12 08 136 32 DOOR RAIL F 4 2 12 037 32 CAPNUT M5X60 Cc 2 1 12 08 137 32 DOOR RAIL G 4 2 ...

Page 8: ...OR STOPPER H 1 4 17 044 32 RAFTER L 4 4 08 189 32 ACORN NUT Hh 1 1 17 057 ROOF PANEL Ll 6 4 08 139 32 CONNECTING PIECE I 4 8 08 143 32 Top Cap M 1 1 08 193 PLASTIC PLUG Ii 1 20 17 058 ROOF PANEL Mm 5 4 08 140 32 CONNECTING PIECE J 4 8 08 144 32 CENTRAL HUB N 1 1 17 055 ROOF PANEL Jj 5 4 08 134 32 UPPER DOOR RAIL END CAP Nn 1 4 17 043 32 RAFTER K 4 8 17 049 32 COVER FOR RAFTER O 4 8 ...

Page 9: ...LIDIFYING BAR V 1 4 17 051 32 GAP COVER BAR P 1 12 17 070 32 SOLIDIFYING BAR V1 1 4 18 067 32 SOLIDIFYING BAR BRACKET Pp 1 12 12 047 32 SCREW M5X15 Ww 1 12 17 053 32 END CAP R 1 12 17 060 ROOF PANEL Y 6 4 17 046 32 FINISHING BAR S 1 4 08 156 32 SCREW M4 16 Z 1 28 17 048 32 SOLIDIFYING BAR T 1 4 15 125 32 STEEL ANGLE Z2 assembled to rafter L 1 4 15 124 32 STEEL ANGLE Z1 assembled to rafter K 1 8 NO...

Page 10: ...Y THE BOXES UNTIL COMPLETELY ASSEMBLED Tools needed Step Ladder 6 8 2 Phillips 2 Robertson Screwdriver not supplied Rubber Mallet Various Files 12 piece of wood Based on the location decide where you would like to position the two 2 doors panels which can slide open to the left or the right your choice ...

Page 11: ...ERSION 11 Assembly Instructions 12x12 Solarium Pre assembled steel angle Z1 Z2 to roof Rafters K L respectively using Bolts Bb To Be Assembled Before Packing 4 Steel Angles Z1 to be attached to the right hole and remaining 4 to the left hole ...

Page 12: ...p to bottom to affix the Panel B and Door Frame D 3 When assembling Angled Panels A you should put the two panels at 135 degree angle then use the angled Connecting Pieces I and J slide from top to bottom to affix the panels together 4 Frame screening should be facing the outside of the unit 5 Door frame step down is on the inside of the unit 6 When sliding the part I J and E into the frames shake...

Page 13: ...ZZZ 182 41212MR 1216 21 GP EN doc WEB VERSION 13 Step 2 1 Affix Gap Cover Bars P by sliding them on top of the exterior groove of the Frames A B D Step 3 ...

Page 14: ...into wheels of Sliding Door C 2 Slide Lower Door Rail G into the plastic guide of the Sliding Door C 3 Use Bolts Bb to affix the plastic Stoppers H one on each end of Top Door Rail F 4 Using a Screw Oo affix the upper door rail End Caps Nn one on each end of Top Door Rail F ...

Page 15: ...side of the solarium 1 Place a Bolt Ww and Washer Gg through the Top Door Frame D and Door Top Rail F and place a Female Bolt Cc 2 from the other side Once all are inserted tighten them all securely 2 Secure the Bottom Door Rail G using a Bolt Cc with a Washer Gg 3 Use Bolt Bb to affix the Door Latch Dd R Dd L onto the frame ...

Page 16: ...ing Bolts Bb 2 Use Screws Z to affix the Rafters K onto the top of panels going through the Metal Piece Z1 attached to the Rafter K Note 1 Rafters must be affixed where panels connect to each other 2 Affix the Rafter K such that the extra hole on the bracket Z1 are facing each other as shown below NOTE 2 ...

Page 17: ...EN doc WEB VERSION 17 Step 6 1 Follow the same procedure of Rafter K to assemble roof Rafters L onto the remaining panels Note Do not tighten the bolts right away as you may have to adjust the angle when inserting the roof panels ...

Page 18: ... align the holes in each bar one on top of the other Place End Caps R under the aligned holes and secure with Bolts Bb 3 Repeat the process with the remaining finishing bars as illustrated 4 In order to finish the installation of the last Finishing Bar S U and U1 you have to unscrew the first Bolts Bb at your starting point and place an End Cap R then re install the Bolts Bb NOTE Make sure all scr...

Page 19: ...Step 8 1 From the inside of the solarium install all the Brackets Pp using Bolts Bb on the Rafters L K 2 From the inside of the solarium install the Solidifying Bar T V and V1 as illustrated using the Bolts Bb NOTE Make sure all screws bolts are tight ...

Page 20: ... doc WEB VERSION 20 Step 9 1 Install the bottom Roof Panels Jj Kk and Mm by sliding them onto Finishing Bar S U U1 NOTE 1 Please refer to the stickers on how to place the roof panels 2 Make sure all screws bolts are tight TOP VIEW ...

Page 21: ...ZZZ 182 41212MR 1216 21 GP EN doc WEB VERSION 21 Step 10 1 Install the upper Roof Panel Aa by sliding them on top of roof Rafters K NOTE Please refer to the stickers on how to place the roof panels ...

Page 22: ...Step 11 1 Once installation of the Roof Panel Aa is complete affix it using the Cover for Rafters 0 using the Screws Oo1 on one side only then place another roof panel and repeat step until last roof panel is installed using all Cover for Rafters 0 01 ...

Page 23: ...ZZZ 182 41212MR 1216 21 GP EN doc WEB VERSION 23 ...

Page 24: ...ZZZ 182 41212MR 1216 21 GP EN doc WEB VERSION 24 Step 12 1 Put Top Cap M on top of the Central Hub N ...

Page 25: ...ZZZ 182 41212MR 1216 21 GP EN doc WEB VERSION 25 Step 13 1 Install the last Roof Panel Aa TOP VIEW ...

Page 26: ...ZZZ 182 41212MR 1216 21 GP EN doc WEB VERSION 26 Step 14 1 Once the last roof panel is installed screw last Cover for Rafters O to the Rafter K with bolts Oo1 ...

Page 27: ...ZZZ 182 41212MR 1216 21 GP EN doc WEB VERSION 27 Step 15 1 Use Acorn Nut Hh and Washer Gg to affix the Top Cap M to the Central Hub N ...

Page 28: ... WEB VERSION 28 Step 16 1 Inside each of the frames panels push two Plastic Plugs Ii into the ground and secure the unit by using two Screws Ee for each panel or use any other type of anchoring suitable for the floor that you are using ...

Page 29: ...ZZZ 182 41212MR 1216 21 GP EN doc WEB VERSION 29 Suggestions The below mentioned are only suggestions in order to permit drainage these will vary depending on your flooring material flatness and slope ...

Page 30: ...ZZZ 182 41212MR 1216 21 GP EN doc WEB VERSION 30 ...

Page 31: ...ZZZ 182 41212MR 1216 21 GP EN doc WEB VERSION 31 NOTE The dimensions are approximate ...

Reviews: