25
2
DO NOT DESTROY THE BOXES UNTIL COMPLETELY ASSEMBLED
FOR FUTURE REFERENCE,
TAKE PICTURES OF ALL SIX SIDES OF EACH OF THE BOXES UPON RECEIPT.
PLEASE VERIFY THE CONTENT OF EACH BOX AGAINST THE LIST OF PARTS
Instruction Manual
IMPORTANT: RETAIN FOR FUTURE REFERENCE, READ CAREFULLY
For assistance with assembly, installation, parts, or customer service, contact Gazebo Penguin Customer
Service Department at the numbers listed below (English & French, Mon-Fri 8:00 AM to 4:00 PM EST):
Montreal
: (514) 276-3485
Elsewhere in Canada and the US
: 1-800-737-7174
Consult with your local governing authority / local municipal codes regarding installation of temporary structures before
purchase or assembly. Some jurisdictions may require permits for, or otherwise regulate, installation and use.
WARNING:
For outdoor use.
Snow should be regularly cleared from the roof and not allowed to accumulate.
Retain your
proof of purchase
for warranty purposes. Also keep the
original boxes
until the installation is complete and correct.
The unit may take more than 4 hours and 3 people are required for this assembly.
PRIOR TO ASSEMBLY:
Please don't destroy boxes until completely assembled.
The foundation must be level, flat, and solid, such as concrete or asphalt.
Keep away from overhead utility lines, tree branches, and other structures.
Check for underground pipes or wires if digging or drilling is required.
Do not install near roof lines or other structures that could shed snow, ice, or excessive rain run-off onto the roof top.
Assemble the structure as close to its final location as possible.
It is recommended to wear safety gloves, safety glasses, and hard hats for installation.
Do not hang from, climb on, or stand on the structure or roof.
Before assembly, read instructions and check that all parts are present in the boxes. If any parts are missing, refer to warranty
information.
A 6ft (1.8m) stepladder, Phillips screwdriver, tape measure, level, mallet, and a tarp to place parts on will be required for
assembly (not included).
Remove top protective film from roof panels prior to assembly; DO NOT remove bottom protective film until ready to insert roof
panels, so as to identify which side is on top.
ANCHORING INSTRUCTIONS:
Proper anchoring of the frame to the base and the wall is required for safety.
Any structure not anchored securely has the potential to fly away during high wind causing damage and safety hazar d.
How the item is anchored, and the hardware and tools required, will vary based upon the set up location and are not provided.
Please check with your local hardware store if for the appropriate anchors for your surface.
Do not anchor to pavers / pavement slabs because they are not a solid foundation.
Periodically check the anchors to ensure they remain secure
CARE AND MAINTENANCE:
In case of a defective or damaged part, or for any other questions concerning the product, please contact the manufacturer
directly.
Please have the parts list and part numbers on hand when ordering or requesting replacement parts.
ROOF PANELS:
Gently clean with an environmentally-friendly soap solution and water using a sponge or washcloth.
Do not use abrasive materials, wire brushes, chemicals, harsh cleaners, or bleach.
Rinse using a garden hose and air dry. If removed, ensure thoroughly dry prior to storage.
Do not use pressure washer.
STRUCTURE:
Gently clean with an environmentally-friendly soap solution and water using a sponge or washcloth.
Do not use abrasive materials, wire brushes, chemicals, harsh cleaners, or bleach.
Rinse using a garden hose and air dry.
Do not use pressure washer.
If there are nicks,chips,and/or scratches see the part # of the paint in the parts list to obtain a matching touch-up paint.
10ft x 12ft / 3.048m x 3.65m
Meters
Solarium