GBA
Global Bill Acceptors
GBA ST1 Operation Manual
Page 22 of 37
Astrosys International Ltd
September 2011
ST1 Operations Manual Rev 2.0
6.0 MECHANICAL INSTALLATION
The product can be configured / installed in both Up and Down stacking configurations. With the
appropriate faceplate selection it can be mounted either with the faceplate showing at the front
of the host machine or with the majority of the faceplate concealed.
With the faceplate (and blanking plate) mounted in the host machine, the GBA ST1 unit fitted with
the appropriate note guide is simply clipped into place in the faceplate. Please note that the note
guide must be fitted to the validator before inserting the validator into the faceplate.
For applications where machine abuse is anticipated, the GBA ST1 unit can be secured to the
faceplate using two thread-forming screws before the faceplate is fitted into the host machine.
Please contact your local regional office for further information.
Details of product dimensions can be found at the end of this document.