Operation
F-60+ Operation and Maintenance Manual
3-8
© GBC Pro-Tech 1999 April
3URFHGXUH 3DVV
1. Prepare to put the print through a second time to
mount the print to the substrate - anything from
wood, to Masinote, to Gator foam. Start by setting
the shims to the appropriate spacing for the mate-
rial used.
2. Trim the board to the size of the print.
3. Align the work to the board and ensure an exact fit.
Place weights on the center of the print to make
sure that it does not move relative to the board dur-
ing the next steps.
4. Raise one end of the print and peel back approxi-
mately two inches of the liner to expose the adhe-
sive that was applied to the print in the first pass.
Fold it under.
5. Lay the print back down evenly and extremely flat.
From the center outward, tack the exposed adhe-
sive to the substrate.
6. Position the piece so that the end with the liner
peeled back is facing the nip. Insert the first one
inch of the board into the nip. Very carefully wrap
the print back and over the top laminating roll. Be
sure there are no wrinkles in the nip area. Carefully
peel off the liner as the board progresses through
the laminator.
7. Trim the piece to the finished size.
Summary of Contents for 930-028
Page 10: ...Safety F 60 Operation and Maintenance Manual 1 6 GBC Pro Tech 1999 April Blank page...
Page 36: ...Operation F 60 Operation and Maintenance Manual 3 18 GBC Pro Tech 1999 April Blank page...
Page 44: ...Warranty F 60 Operation and Maintenance Manual 5 2 GBC Pro Tech 1999 April Blank page...
Page 46: ...Specifications F 60 Operation and Maintenance Manual 6 2 GBC Pro Tech 1999 April Blank page...