F-60+ Operation and Maintenance Manual
Operation
© GBC Pro-Tech 1999 April
3-15
352&(66&21752/&+$57%
Product:____________________
Process: Cold Mount & Laminate (Second Pass)
Date:________________
352&(66&21752/',$*5$0%
Cold Mount and Laminate (Second Pass)
☞
NOTE
Use footswitch to load, then accelerate materials through rolls.
FRONT CONTROL SETTINGS
Speed: 0-6 fpm (0-180 cpm)
Reverse/Forward: Forward
Roll Pressure: Trial
Top Heater: 32-105 °F (0-40 °C)
Cooling: Off
Bottom Heater: 32 °F (0 °C)
Hold
Encapsulated
Image
Release Liner
(Peel prior to nip)
Foam
Core
☞
OPTIONAL
Board can be fed
through the pull
rolls using reverse
mode.
Summary of Contents for 930-028
Page 10: ...Safety F 60 Operation and Maintenance Manual 1 6 GBC Pro Tech 1999 April Blank page...
Page 36: ...Operation F 60 Operation and Maintenance Manual 3 18 GBC Pro Tech 1999 April Blank page...
Page 44: ...Warranty F 60 Operation and Maintenance Manual 5 2 GBC Pro Tech 1999 April Blank page...
Page 46: ...Specifications F 60 Operation and Maintenance Manual 6 2 GBC Pro Tech 1999 April Blank page...