GBC AdvancedPunch Pro
11/07/2018
Punch Quality
3-9
10. Check that the clutch set screws are secure to the shaft.
•
Check that the clutch set screws are tight on the shaft
(reference ARP 3.7 to access the clutch)
•
If the set screws are loose perform ARP 3.7 Installation
steps to reset them.
•
If the clutch cannot be reoriented to align with the notches
in the shaft, remove the clutch and inspect the shaft for
damage (PL 4.1). If the shaft is undamaged reinstall the
clutch in the proper position and resume operation.
•
Replace the punch module shell if the shaft is damaged
(PL 4.1)
This clears the fault
Yes
- Return to normal operation;
No
- Escalate to 2
nd
level.
3.9 Punched holes look elongated towards the trail
edge of the sheet
This failure usually occurs when the Punch cycle is slowed.
1. Lubricate die-set. Do GP 6.7.3.
This clears the fault
Yes
- Return to normal operation;
No
- Go to Step 2
2. Check if correct pulley is used depending on 115V or 230V
machine, 115V machine should use 38T pulley and 230V
machine should use 34T pulley (PL 5.6).
The correct pulley is used.
Yes
- Go to Step 3;
No
- Change the pulley
3. Check the number of punch cycles of the machine, do GP
6.1.11 Punch Cycles. The normal life of the punch clutch is 15
million punch cycles. If the machines has completed 15 million
punch cycles, do REP 3.1 to replace the Punch Module.
The punch has less than 15 million cycles
Yes
- Go to Step 4;
No
- Replace the punch module (REP 3.1)
4. Do GP 6.24 Punch Clutch Inspection and Cleaning.
This clears the fault
Yes
- Return to normal operation;
No
- Escalate to 2
nd
level
Summary of Contents for AdvancedPunch Pro
Page 26: ...Service Call Procedures 08 20 2015 GBC AdvancedPunch Pro 1 8 Notes ...
Page 28: ...GBC AdvancedPunch Pro 11 07 2018 RAPS 2 2 ...
Page 78: ...Punch Quality 11 07 2018 GBC AdvancedPunch Pro 3 2 This page intentionally left blank ...
Page 230: ...Repairs Adjustments 08 20 2015 GBC AdvancedPunch Pro 4 142 Notes ...
Page 263: ...GBC AdvancedPunch Pro 09 11 2018 Parts List 5 33 PL 6 4 Wiring Drawing OEM Configurations ...
Page 264: ...Parts List 09 11 2018 GBC AdvancedPunch Pro 5 34 PL 6 5 Wiring Drawing DFA Configurations ...
Page 360: ...General Procedures and Information 09 11 2018 GBC AdvancedPunch Pro 6 90 Notes ...
Page 362: ...Wiring Data 08 20 2015 GBC AdvancedPunch Pro 7 2 This page intentionally left blank ...
Page 363: ...GBC AdvancedPunch Pro 08 20 2015 Wiring Data 7 3 System Wiring ...
Page 364: ...Wiring Data 08 20 2015 GBC AdvancedPunch Pro 7 4 System Wiring DFA Configurations ...
Page 365: ...GBC AdvancedPunch Pro 08 20 2015 Wiring Data 7 5 Plug Jack Connectors ...
Page 366: ...Wiring Data 08 20 2015 GBC AdvancedPunch Pro 7 6 Plug Jack Connectors DFA Configurations ...
Page 367: ...GBC AdvancedPunch Pro 08 20 2015 Wiring Data 7 7 Notes ...
Page 368: ...GBC AdvancedPunch Pro 08 20 2015 Installation Instructions 8 1 8 Installation Instructions ...
Page 369: ...Installation Instructions 08 20 2015 GBC AdvancedPunch Pro 8 2 ...
Page 370: ...GBC AdvancedPunch Pro 08 20 2015 Installation Instructions 8 3 ...
Page 371: ...Installation Instructions 08 20 2015 GBC AdvancedPunch Pro 8 4 ...
Page 372: ...GBC AdvancedPunch Pro 08 20 2015 Installation Instructions 8 5 ...
Page 373: ...Installation Instructions 08 20 2015 GBC AdvancedPunch Pro 8 6 ...
Page 374: ...GBC AdvancedPunch Pro 08 20 2015 Installation Instructions 8 7 ...
Page 375: ...Installation Instructions 08 20 2015 GBC AdvancedPunch Pro 8 8 ...
Page 376: ...GBC AdvancedPunch Pro 08 20 2015 Installation Instructions 8 9 ...
Page 377: ...Installation Instructions 08 20 2015 GBC AdvancedPunch Pro 8 10 ...
Page 378: ...GBC AdvancedPunch Pro 08 20 2015 Installation Instructions 8 11 ...
Page 379: ...Installation Instructions 08 20 2015 GBC AdvancedPunch Pro 8 12 ...
Page 380: ...GBC AdvancedPunch Pro 08 20 2015 Installation Instructions 8 13 ...
Page 381: ...Installation Instructions 08 20 2015 GBC AdvancedPunch Pro 8 14 ...