Page 4 - 5
Installation
Digital Feeder Operation and Maintenance Manual
© GBC Pro - Tech February 2000
Figure 4.2.5 Parts of the conveyor
Drive box
Belts ( 5 )
Metal balls
( 13 )
Sheet guide
assembly
Rear idler
Front
idler
Rear feed
plate
Front feed
plate
Safety key
Figure 4.2.6 Sheet guide assembly
Vertical guide adjust
Horizontal guide adjust
Position bar
Guide
The accessory bag attached to the
conveyor when shipped contains;
• ( 13 ) Metal balls
• ( 1 ) Pneumatic tubing
• ( 1 ) Encoder cable
4.3 Unpacking
INFORMATION
A L L S H I P M E N T S A R E E X - W O R K S . At our
dock, title passes to the buyer. Please review
your insurance coverage prior to shipment,
as you are responsible for all subsequent
freight charges and risks.
INFORMATION
Before signing the Bill of Lading, you
should inspect the crate and / or pallet
for signs of damage or missing items; if
applicable, make note of this on the
Bill of Lading.
INFORMATION
Depending on the destination and customer
preference, the Digital Feeder may be
shipped by various methods. The machine
may arrive shrink wrapped or in a
plywood crate on a skid. Please follow
the unpacking procedure that pertains
to your method of shipment.