Page 4 - 15
Installation
Digital Feeder Operation and Maintenance Manual
© GBC Pro - Tech February 2000
4.8 Connections
Connections will consist of power, encoder, air,
conveyor drive cable, placement of the metal balls and
connecting air to the optional GBC Digital Cutter.
Inspect all cables and hoses for damage before
connecting them. Any damage cable or hose should be
replaced immediately.
Power
The feeders plug requires a grounded three prong
receptacle. This unit operates on standard 110 VAC.
a) Connect the power cord from the electrical box
of the feeder to its proper receptacle.
Power
cord
Conveyor drive cable
a) Connect the conveyor drive cable from the
feeders electrical box to the conveyors drive
box. Refer to Figure 4.8.1 and Figure 4.8.2
Figure 4.8.1 Conveyor drive cable
Conveyor
drive cable
Figure 4.8.2 Conveyor drive box