Page 4 - 8
Installation
F 60 C Operation and Maintenance Manual
© April 2001 General Binding Corporation
4.7 Installing levelers
Leveling of the machine is a customer option. If
you choose not to level the laminator and you encounter
output problems, please level the machine and try your
application again before calling for technical support.
Tools required
• ( 2 ) 3/4” open end wrenches
• Four leveling pads
( from the accessory pack )
a) Verify that the laminator has sufficient room
around it to load film, walk around and to be
serviced if necessary.
b) Place one leveling pad on each of the four
leveling bolts on the laminator.
L e ve ling p a ds
Ja m n uts
c) Use a 3/4 in. open end wrench to secure the
jam nut against the leveling pad.
4.8 Leveling
Leveling of the laminator is very important in the
way the machine performs. Leveling is crucial to the tram
( tracking ) of the materials through the machine.
Tools required
• ( 2 ) 3/4 in. open end wrenches
• 1/8 in. allen wrench
• Level
• A second person
a) With a 1/8 in. allen wrench, remove the drive
side and control side cabinet covers by;
1) Loosen the three screws along the
bottom.
2) Remove the seven screws along the
top and sides of the cover.
PRO-TECH
F-60 C
1
2