Page 4 - 9
Installation
F 60 C Operation and Maintenance Manual
© April 2001 General Binding Corporation
e) Position the level on the top of the drive side
cabinet.
A
PRO
TECH
F-60 C
f) Level the drive side from front to back by
turning the leveling nut clockwise to raise or
counter clockwise to lower.
g) Position the level center of the upper tie bar.
A
PRO
TECH
F-60
C
h) Level the laminator from drive side to control
side by turning the leveling nut clockwise to
raise or counter clockwise to lower.
b) Loosen the nut on the inside of both cabinets
securing the leveling bolt with a 3/4 in. wrench.
Inside nuts
c) Position the level on the top of the control side
cabinet.
PRO
TECH
F-60
C
d) Level the control side from front to back by
turning the leveling nut clockwise to raise or
counter clockwise to lower.
9
Leveling nuts