Page 4 - 13
Installation
F 60 C Operation and Maintenance Manual
© April 2001 General Binding Corporation
d) Rotate the speed dial to a setting greater than 1.
1
2
3
4
5
6
7
8
9
10
e) Press the motor engage/ disengage to ENGAGE.
(disengage)
(engage)
g) Press one of the four E-STOPs.
h) The bottom main roller stops turning, the power
indicator light goes out, the display on the
temperature controller unit goes out.
i) Turn the E-STOP 1/4 turn counter clockwise to
unlatch.
1
/4
tu
rn
j) Repeat steps b) and e) for the remaining three
E-STOPs.
PHOTO-EYE
a) Cut a piece of 1/2 inch ( 1.3 cm ) thick foam
board to 4 inches x 6 inches. ( 10 cm x 15 cm )
This piece will be referred to as the “finger board”.
C A U T IO N
D o not use a hard substrate or a substrate
w ith sharp edges. Y ou m ay cause dam age
to the lam inating rollers.
b) Ensure all E-STOPs are in the unlatched position
and remove the pressure plate from the front feed
table.