P.O.U. #1
P.O.U. #2
P.O.U. #3
Outlet From
Water Storage
Tank
P.O.U. #1
P.O.U. #2
P.O.U. #3
Outlet From
Water Storage
Tank
1/2” Tubing
1/2” Tubing
1/2” Tubing
3/8” T
ubing
3/8” T
ubing
3/8” T
ubing
3/8” T
ubing
3/8” T
ubing
3/8” T
ubing
POU CONNECTION LAYOUTS
Product to POU (Brewers, Espresso, Water Towers, etc...
City Feed
Drain
Below are two layouts showing suggestive POU connections for our units. We suggest a 1/2” trunk line and 3/8” branch line
to the POU.
‡Disclaimer: This drawing is theoretical and may not apply to actual situations. It is intended to help installers visualize typical plumbing line runs from the “water
equipment” to the store Coffee/Tea Brewers, Espresso Machines, and Water Tower.
Product to POU (Brewers, Espresso,
and Water Tower)
City Feed
Drain
LEGEND
Product to POU (Brewers, Espresso, Water Towers, etc...
City Feed
Drain
Hand
Sink
GC Water
Water
Unit
Water
Tower
Brewers
Espresso
Machine
Product to POU (Brewers, Espresso, Water Towers, etc...
City Feed
Drain
Hand
Sink
GC Water
Water
Unit
Water
Tower
Brewers
Espresso
Machine
Product to POU (Brewers, Espresso, Water Towers, etc...
City Feed
Drain
PAGE 7