Page 15 of 28
M434/500 Prototype Commissioning Manual
PN W453101Rev- Nov-02-1998
Test Main Boom
Following each main boom calibration perform a series of tests that will sufficiently show the accuracy of
the calibration in all working areas of the main boom.
Test the unladen boom, two different loads at three different lengths and three different angles for each
length of main boom.
Boom ________
Displayed
Length
Displayed
Angle
Displayed
Radius
Measur’d
Radius
Radius
Error
Displayed
Load
Actual
Load
Load
Error
Notes