background image

- 28 -  

March 23, 2018 

 

User Manual for SR-1000 Standalone Integrated Media Block™  

5. AUTOMATION 

 

 

5.7  Import/ Export 

This tab allows the import and export of automations cues which have been setup on the SR-
1000. 
 

 
 

 

 

1

 

 

[Import/Export Device]

 

   

Import

 opens a pop-up window which allows the user to select a 

configuration file for the selected automation device. 
 

Export

 automatically saves the configuration file for the selected 

automation device to your web browser’s default download 
location. 
 

 

2

 

 

 [Import/Export Configuration]

 

  

Import

 allows user to select configuration file containing all 

automation cues from an alternate server  
 

Export

 automatically saves the configuration file containing all 

automation cues to your web browser’s default download 
location. 

 

Figure 17: Import/Export

 

1

Summary of Contents for SR-1000 STANDALONE INTEGRATED MEDIA BLOCK

Page 1: ...USER MANUAL FOR SR 1000 STANDALONE INTEGRATED MEDIA BLOCK Version 17 0 March 23 2018...

Page 2: ...ation 7 2 The SR 1000 Web User Interface WebUI 8 2 1 Access Levels 9 2 2 General Notes on the SR 1000 WebUI 10 2 2 1 Recommended web browsers 10 2 2 2 Single User Access 10 2 2 3 Session Expiry 11 3 D...

Page 3: ...4 Encrypt 43 7 1 1 5 Storage 44 7 1 1 6 Sensor 45 7 1 1 7 Ethernet 46 7 2 Playback 47 7 2 1 Audio Channel Mapping 52 7 2 1 1 Preset 54 7 3 Storage 55 7 3 1 Actions of Portable Enterprise Storage 57 7...

Page 4: ...re subject to change without notice due to continuous product development and improvements In no other event shall GDC Technology Limited be liable for any loss of profit or any other commercial damag...

Page 5: ...ict Shenzhen China Tel 86 755 8608 6000 C Esteve Terradas n 27 esc D Despacho 1 08023 Barcelona Spain Tel 34 93 159 51 75 Peru Lima USA Los Angeles Brazil S o Paulo Singapore Calle Manuel Miota 170 Mi...

Page 6: ...Barat 11440 Indonesia Tel 62 21 2920 4691 3F Kyobashi Chuo Bldg 1 14 7 Kyobashi Chuo ku Tokyo 104 0031 Japan Tel 81 3 5524 2607 Office No B 207 208 Everest Chamber Andheri Kurla Road Marol Andheri Eas...

Page 7: ...ructions on how to use and manage the GDC SR 1000 Standalone Integrated Media Block TM The SR 1000 has a web based user interface WebUI The WebUI functionality can be broken down into five main sectio...

Page 8: ...echnology personnel All warnings on the SR 1000 mentioned in this documentation manual should be adhered to All instructions for operating and maintaining the SR 1000 must be followed closely 1 2 2 El...

Page 9: ...the same network as the SR 1000 2 The SR 1000 WebUI can be accessed by a web browser Google Chrome or Mozilla Firefox are recommended 3 Enter the IP address of the SR 1000 on the web browser to access...

Page 10: ...ess the SR 1000 Different users will have different access levels on the WebUI Configuration tab Access Level Available access User Dashboard Playback Automation and Content tabs Technician Dashboard...

Page 11: ...x web browsers These web browsers are recommended for use with the SR 1000 WebUI 2 2 2 Single User Access The SR 1000 WebUI allows single user access only When a second user logs in using the same or...

Page 12: ...ssion Expiry The SR 1000 WebUI session will expire if there is no activity from the user for 5 minutes A warning message will be displayed and the user will be logged out Click on this warning message...

Page 13: ...Licenses installed Capabilities and System alerts 1 System Information Displays SR 1000 system information 2 Storage Information Displays storage status on the SR 1000 3 Network Information Displays...

Page 14: ...s Shutdown A pop up window will be displayed Click OK to confirm shutdown 9 Capabilities Displays the supported features or capabilities of the SR 1000 10 SM Connection Status Displays the connection...

Page 15: ...rently playing clip 2 Clip Playback Time Displays the duration of the current clip played and total duration of the clip 3 Playback Progress Bar This bar will start advancing to show playback progress...

Page 16: ...mes Forward move forward by 20 frames Move to the end of the clip 8 Playback Status Display Displays the current playback status Playing Paused Stopped or Preparing 9 Clip Format Displays information...

Page 17: ...expand and list all the clips under the selected category Content can be dragged and dropped between Content List and Playlist Editor 3 Playlist Editor The contents of the playlist being currently edi...

Page 18: ...playlists 10 Show List List of playlists available on the SR 1000 The selected playlist content will be shown in the Playlist Editor Note A playlist that is currently playing cannot be edited 11 Add N...

Page 19: ...ts 2 End Frame Time Set the time code frame number where playback of the clip ends 3 Subtitle Offsets Set the Top Right Bottom and Left values to adjust the position of the subtitles projected 4 Start...

Page 20: ...ve the changes 4 3 Schedule This tab is used to schedule playback 1 List Day Week Month Select to display the schedules on the SR 1000 in a list per day per week or per month 2 Today Switch back to cu...

Page 21: ...ser can select Repeat Once or Repeat More and further enter details Click the Add button to add the schedule 5 Schedules Schedules are displayed here Display will change according to schedule in 1 6 S...

Page 22: ...TION This tab is used to set up automation and input triggers Scheduling and manual triggering of automation cues can be done here Figure 10 GDC Automation Workflow 5 1 Trigger This tab is used manual...

Page 23: ...This section is used to manually execute a configured automation label Select a label and click the Execute button to execute the automation label manually 3 Projector Quick Setup This section is use...

Page 24: ...ve 2 Remove Schedule Click to remove the selected scheduled automation cue 5 3 Cue This tab shows the automation cues configured on the SR 1000 New automation cues can be added and configured on this...

Page 25: ...cute this automation cue 2 Create Click Create to create a new cue A pop up window will be shown Enter the name of the cue and click OK Click to add actions to the cue Configure the Device Action and...

Page 26: ...R 1000 When input is detected on supported devices the configured automation cues will be triggered on the SR 1000 1 Add Trigger Click to add an input trigger Select and complete the fields for Device...

Page 27: ...ith external automation devices 1 Device This is a list of configured automation devices on the SR 1000 When a device is selected from the list device details are displayed 2 Create Click Create to cr...

Page 28: ...Error Label Select a specific automation cue which will be executed whenever a playback error occurs 3 Quick Mode Label Enables selection of a specific automation cue which can be triggered quickly us...

Page 29: ...ct a configuration file for the selected automation device Export automatically saves the configuration file for the selected automation device to your web browser s default download location 2 Import...

Page 30: ...s KDMs required for playing encrypted content 3 Ingest License Delivery Messages LDMs 4 Delete content from IMB storage 5 Verify content on IMB storage 6 1 Summary This tab shows a summary of the cont...

Page 31: ...kage This tab shows the content available on the SR 1000 1 PKL CPL Displays list by CPLs or PKLs 2 Filter PKL CPL list will be filtered by the text entered here Click Clear Filter button to clear the...

Page 32: ...ription of the error will be shown Immediately Verify Immediate full verification of the selected CPL PKL The Verification status will be displayed under the Status tab Schedule Verify Set a date and...

Page 33: ...List Displays a list of the KDMs on the SR 1000 When a KDM is selected from the list KDM details are displayed on the right panel 2 Verify Verify the selected KDM Any errors found will be displayed 3...

Page 34: ...censes on the SR 1000 1 LDM List Displays a list of licenses installed on the SR 1000 When an LDM is selected from the list LDM details are displayed on the right panel 2 Verify Verify that the LDM is...

Page 35: ...000 2 Live Source Displays the list of content for Live Play Please refer to Section 6 5 1 for details 3 Create Click Create to add a new content ingest source Fill in the details for the content inge...

Page 36: ...selected content ingest source Delete and Edit buttons only available on Created Sources 6 5 1 Live Source Live play allows playback from content ingest source without ingesting o Live play is suppor...

Page 37: ...will be shown to display the list of Live Play Sources 8 Ingest Two content ingest options are available Ingest Start content ingest immediately Schedule Ingest Set a date and time to ingest the sche...

Page 38: ...te a selected schedule 6 7 Status This tab shows content ingest and verification status 1 Status Displays the list of content ingest delete and verify tasks 2 Refresh Click Refresh to refresh the list...

Page 39: ...ettings and configure aspects of SR 1000 operation SR 1000 configuration consists of five categories General Playback Storage System and Maintenance 7 1 General This tab is used to configure general o...

Page 40: ...P monitoring and reporting Please refer to Section 7 1 1 for details Click Save to save the settings or Close to cancel the changes 7 1 1 SNMP Configuration The SNMP feature is an option on the SR 100...

Page 41: ...he trap will continue to be resent only as long as the error condition exists 3 System UpTime Threshold Indicate the threshold time in days NOTE When Trap is On a trap will be sent if the System UpTim...

Page 42: ...n SNMP information is queried 2 System Name The name of the Server This value will be displayed when SNMP information is queried This will be automatically set to the server model if the Automatically...

Page 43: ...be generated when a DCP ingest is completed When this option is checked an SNMP trap will be generated when a DCP ingest fails When this option is checked an SNMP trap will be generated when the play...

Page 44: ...7 CONFIGURATION 7 1 1 4 Encrypt 1 Enable Authentication Allows user to enable SNMP Authentication by providing Username The default Password can be changed using the Change button Note The new passwor...

Page 45: ...e device by using the and buttons Check the corresponding storage devices to activate the Trap NOTE When Trap is On a trap will be sent to the SNMP Manager when the threshold temperature is reached 3...

Page 46: ...reached 6 Send detailed S M A R T traps Enables the sending of SNMP traps when specific hard disk S M A R T attributes change 7 1 1 6 Sensor 1 CPU Temperature Threshold Set the threshold temperature...

Page 47: ...1 7 Ethernet 1 Monitor IMB Ethernet 2 Enables sending an SNMP trap if the system detects that the selected network interface is down 2 Monitor IMB Ethernet 1 Enables sending an SNMP trap if the syste...

Page 48: ...on playable CPLs in a show playlist will be skipped during playback Enabling this option allows adding of schedules with overlapping start or end times 2 Subtitle Subtitle Overlay Subtitle Delay When...

Page 49: ...the CPL Timeout in seconds for communication with the projector Select the blank time of the projector during change of PCF or format This is to prevent noise when the PCF or format is changed 4 Capti...

Page 50: ...me code over UDP Enter the IP of the receiver of time code transmission of UDP Indicates the time interval between transmissions 6 Video Force 2D playback Enable RealD Ghostbusting Enable Dolby 3D Cor...

Page 51: ...yed behind video Change audio output sampling rate Output audio sampling rate can be fixed at 48kHz or 96kHz for all content or it can match the content s audio sampling rate option None If the output...

Page 52: ...mos A valid license is required to enable Dolby Atmos support on the SR 1000 Check Enable to enable Dolby Atmos support Set the Atmos Data IP and Atmos TLS IP according to network requirements 9 Sync...

Page 53: ...an be re mapped to appear on different audio channels 1 Audio output based on the number of audio channels in the audio track of the DCP can be configured in this tab 2 The preset for the number of au...

Page 54: ...ed on SMPTE audio channel configuration labels can be configured in this tab 2 Audio output for individual SMPTE audio channel labels can be changed here 3 Check the Use SMPTE audio labels checkbox to...

Page 55: ...udio channel output presets can be configured in this tab 2 Select a preset to view or change preset settings 3 Add a new preset or delete the current preset 4 Audio configuration for an audio preset...

Page 56: ...igure the primary storage for the SR 1000 CineCache Select this option to use the built in CineCache as storage NOTE This is only available on SR 1000 with Cinecache installed PSD 3000 Configure the S...

Page 57: ...for playback 3 Content Ingest Options Remove corrupted assets during ingest Skip checking assets during ingest With this option enabled any corrupted assets encountered during ingestion are removed W...

Page 58: ...ge 7 3 1 1 Create new RAID array 1 Create new RAID array Clicking on the Create new RAID array option opens a pop up window Select the drive name and click on Create The RAID creation process will be...

Page 59: ...58 March 23 2018 User Manual for SR 1000 Standalone Integrated Media Block 7 CONFIGURATION 7 3 1 2 Hard disk information Figure 42 Select disk Figure 43 Hard Disk Information 1...

Page 60: ...to the local computer laptop in the form of a txt file Click on Close to return to the Storage menu 7 3 1 3 RAID filesystem check 1 RAID Filesystem check Clicking on the RAID Filesystem check option o...

Page 61: ...60 March 23 2018 User Manual for SR 1000 Standalone Integrated Media Block 7 CONFIGURATION 7 3 1 4 Storage Performance Figure 46 Select disk Figure 45 Storage Performance 1...

Page 62: ...een Click on Save to save the results to the local computer laptop in the form of a txt file Click on Close to return to the Storage menu 7 3 1 5 Increase Rebuild Speed 1 Increase Rebuild Speed If the...

Page 63: ...2 March 23 2018 User Manual for SR 1000 Standalone Integrated Media Block 7 CONFIGURATION 7 3 1 6 High bitrate playback test Figure 49 HBR Playback fitness test 2 Figure 48 HBR Playback fitness test 1...

Page 64: ...on opens a pop up window Click on Confirm to initiate the test The progress will be displayed on screen Once complete click on Save to save the results to the local computer laptop in the form of a tx...

Page 65: ...please refer to the SR 1000 Installation manual 2 RTC Time offset Offset Limit Make adjustments to the time on the IMB In accordance with DCI specifications the SR 1000 allows a time offset from 360s...

Page 66: ...main IP address of the SR 1000 The Web UI interface can be reached at this IP address Enable this to set up a secondary network on the SR 1000 This is usually connected to a content management network...

Page 67: ...to extract debug logs from the SR 1000 for analysis by GDC personnel Time duration includes 1 Week 1 Month 3 Months and All After selecting the time duration Generate logs button will be enabled A pop...

Page 68: ...ogs from the SR 1000 After selecting the Date Time Generate SMPTE Log button will be enabled A pop up window will be shown to display the log extraction progress After log generation a pop up window w...

Page 69: ...ration Backup Restore Backup and Restore options are available The Backup Configuration saves the IMB configuration to a backup file A pop up window will be shown to save the configuration file The Re...

Page 70: ...ber of days in advance to issue a warning before warranty lock expiry can be set 2 Upgrade Software Upgrade When this button is clicked a pop up window will be shown with an option to choose and uploa...

Page 71: ...software version that supports IMB synchronized playback Please check with your regional GDC office for the correct software version to be used Notes 2 IMB synchronized playback is only enabled with a...

Page 72: ...be set to Play Right Eye 3 Multicast group address Set Multicast group address for the master and slave server Multicast group addresses can range from 224 0 0 0 to 224 0 0 254 Note 1 Multicast group...

Page 73: ...e server DCP ingest from a network source NFS FTP CIFS DCP deletion Note This feature will not work for the following DCP ingest from a local source USB eSATA CRU KDM ingest 8 1 1 IMB Synchronized Pla...

Page 74: ...hows video output mode for 2D and 3D SPLs This can be used to configure projector macros for IMB synchronized playback IMB sync playback with Play Left Eye Play Right Eye selected IMB sync playback wi...

Page 75: ...erification testing and certification company SGS Labs https www sgs com 1 Temperature Humidity Cycling Test SGS Test Report Number SZRL2018010392_02 Published Date March 05 th 2018 2 Vibration Test S...

Page 76: ...24 3607 Tel 86 755 8608 6000 India Mumbai Spain Barcelona Office No B 207 208 Everest Chamber C Esteve Terradas Andheri Kurla Road Marol Andheri East n 27 esc D Despacho 1 Mumbai 400 059 India 08023 B...

Reviews: