- 10 -
December 22
nd
, 2022
GDC SR-1000 STANDALONE INTEGRATED MEDIA BLOCK
™
INSTALLATION MANUAL
3.CONNECTING PORTABLE STORAGE/ENTERPRISE STORAGE WITH THE SR-1000
2.1. Remove existing interface board/placeholders from
the Projector
Before installing the SR-1000, check the sections below to ensure proper placement.
2.1.1. Barco Projector Placement
shows an interface board (with SMPTE 292 inputs) connected to a Barco projector.
This board must be removed in order to install the SR-1000, as shown in
Figure 3: Remove interface board from Barco Projector
Figure 4: SR-1000 Placement on Barco Projector