- 15 -
December 22
nd
, 2022
GDC SR-1000 STANDALONE INTEGRATED MEDIA BLOCK
™
INSTALLATION MANUAL
3.CONNECTING PORTABLE STORAGE/ENTERPRISE STORAGE WITH THE SR-1000
3.2.1. Placement of the Enterprise Storage
It is recommended that the Enterprise Storage unit should be placed on the projector pedestal
as illustrated in
, such that the eSATA cable length (provided with the package) is
sufficient enough to establish the connection between the IMB & Enterprise Storage.
Please ensure that the eSATA cable is not bent sharply or stressed.
Figure 12: Enterprise Storage Placement