Critical Power
Modifications reserved
Page 50/60
GE_UPS_ISG_TLE_SUL_M16_M50_2bU_V010.docx
Installation Guide
TLE Series 160 - 500 UL S2B
4.9.3
Control bus cable location
WARNING !
This installation must be verified by trained personnel before the initial start-up.
ENSURE THAT THE UPS INSTALLATION IS COMPLETELY POWERED DOWN.
Keep SELV cables separated from HIGH VOLTAGE cables.
Fig. 4.9.3-1 TLE Series 160 - 200 - 225 - 250
View electronic module on intermediate unit
Fig. 4.9.3-2 TLE Series 300 - 400 - 500
View electronic module on intermediate unit
Access to the control bus connection
The communication bus cable connectors are placed on the two boards
“
P13/P14 – IM0022 – Bus
Interface Board”
(see
Fig. 4.9.3-1
and
4.9.3-2)
.
Fig. 4.9.3-3 View electronic module on intermediate unit
Control bus cables connection
•
Plug the cables
J1A – J2A (1/2/3/4/5)
and
J1B –
J2B (1/2/3/4/5)
on the connectors
J1A – J2A
and
J1B – J2B
placed on the two boards
“
P13/P14 –
IM0022 – Bus Interface Board”
.
•
Fix the communication bus cables
J1A – J2A
(1/2/3/4/5)
and
J1B – J2B (1/2/3/4/5)
with the
provided cable clamps “
A
”.
TLES_UL_2
25-250_S1
_RPA conn
ection_01a
Q1
I ON
0 O
FF
1
2
EP
O
EP
O
-
+
TLES_UL_4
00-500_S2
_RPA conn
ection_01a
Q1
1
2
I ON
0 O
FF
EP
O
EP
O
- +
J2
J1
J2
J1
B
A
J1A/1
J1B/2÷5
J1B/1
J1A/2÷5
-
+
EPO
EPO
TLES_160-40
0_S1_RPA c
onnection_
02