background image

 

            

  8 Circuits Generator Interlock Kit: THQLLX8DR

 
 
 

General 

To  comply  with  the  National  Electrical  Code  and 
Underwriters  Laboratories,  the  Generator  Interlock  kit 
must  be  installed  in  accordance  with  the  information 
contained  in  this  instruction  manual  and  by  a  qualified 
electrical contractor and/or licensed electrician. 

 

Introduction 

This  bulletin  provides  instructions  for  installing  the 
interlock  and  circuit  breaker  retainer  on  the  400A  rated 
Model 1 GE Meter Socket Load Centers: TSDR840UFCU. 

 

Installation 

Step 1: Install the Retainer 

1.

 

Uninstall  the  dead  front,  and  retain  the  mounting 
screws.

 

2.

 

Install  the  2-pole  back-fed  main  breaker  in  the 
position shown in Figure 1.

 

3.

 

Install  the  conductors  into  the  2-pole  back-fed  main 
breaker. Check breaker for wire range and tightening 
torque information.

 

4.

 

Loosen the copper strap mounting screw.

 

5.

 

Install the retainer and secure using the nuts provided 
in  the  kit  (see  Figure  1).  Tighten  to  35  lbs-in  (4  N-m).

 

 

Figure  1:  Main  Breaker  Retainer 

 

 

 

 

Step 2: Drill the Mounting Holes on Dead front 

A drilling template is provided to ensure proper alignment 
of the interlock 

1.

 

Locate dead front removed earlier in Step 1.

 

2.

 

Insert the folds of the template in the knockout  of 4-
pole  main  breaker  and  slide  towards  the  branch 
breaker  knockouts  until  it  ceases  to  slide  further  (see 
Figure 2).

 

3.

 

Drill the pilot holes through the two identified holes in 
the template using a 3/32” (0.093”) drill bit.

 

4.

 

Remove  the  drill  template  and  re-drill  the  two  pilot 
holes with ¼” (0.250”) drill bit. 

5.

 

Remove any burrs resulting from drilling the holes.

 

 

 

 

Figure  2:  Mounting  Hole  Template 

 

Step 3: Mounting the Interlock 

1.

 

Place the interlock on the front side of the dead front, 
over the mounting holes drilled in Step 2.

 

2.

 

Mount  the  interlock  using  the  screws,  washers,  lock 
washers  and  nuts  provided  in  the  kit  (see  Figure  3). 
Tighten to 45 lbs-in (5 N-m). 

 

3.

 

Make sure both the 2-pole main and the 2-pole back-
fed  main  breakers  are  in  the 

OFF

  position  before 

installing the dead front. 

 

2-Pole 
Main Breaker

Back-fed 
Main Breaker

Interior

Branch 
Breaker

Mounting 
Nuts

Retainer

2-Pole 
Main Breaker

Back-fed 
Main Breaker

Interior

Branch 
Breaker

Mounting 
Nuts

Retainer

Holes

Template

Folds

Dead 
front

Holes

Template

Folds

Dead 
front

DEH 41153 Generator Interlock Kit Installation Instructions    R03 

WARNING

: Hazard of electrical shock or burn 

Turn off power supplying this equipment before working inside 

GE Energy 

Reviews: