background image

 

4.

 

Apply critical load stickers next to appropriate branch 
breakers for generator loads.

  

 
 
 
 

 

 

 

 

 

 

 

 
 
 
 
 

Figure  3:  Interlock  Installation

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Interlock Operation 

To energize the panel from Generator Power: 

1.

 

Turn 

OFF

 the 2-pole main breaker

 

2.

 

Turn 

OFF

 all the branch circuit breakers

 

3.

 

Move the sliding plate on the interlock towards branch 
breakers using the tabs provided

 

4.

 

Turn 

ON

 the 2-pole back-fed main breaker 

5.

 

Turn 

ON

 the branch circuit breakers supplying critical 

circuits 

 

To energize the panel from Utility Power: 

1.

 

Turn 

OFF

 the 2-pole back-fed main breaker

 

2.

 

Turn 

OFF

 all branch circuit breakers

 

3.

 

Move the sliding plate on the interlock towards branch 
breakers using the tabs provided

 

4.

 

Turn 

ON

 the 2-pole main breaker 

5.

 

Turn 

ON

 the branch circuit breakers 

 

 

 

   

    

 

 

 

 

                                 General  Electric  Company 

 

                                 41  Woodford  Ave.,  Plainville,  CT  06062 

 

                                 DEH41153  R03  ©  2012  General  Electric  Company 

 

These  instructions  do  not  cover  all  details  or  variations  in  equipment  nor  do  they  provide  for  every  possible  contingency  that  may  be  met  in 
connection  with  installation,  operation,  or  maintenance.  Should  further  information  be  desired  or  should  particular  problems  arise  that  are  not 
covered sufficiently for the purchaser’s purposes, the matter should be referred to the GE Company.

 

GE Energy 

Screws 

Lock washer 

Nut

 

Interlock 

Dead front 

Washer 

Reviews: