background image

Installation Guide 

 

Warning:   

LED165/M400/740 Tether Kit 

Step 8 
Minimize the length of the wire attached to the lamp.   
Zip tie extra loose wire if necessary. 

GE and the GE Monogram are trademarks of the General Electric Company. All other trademarks are the property 

of their respective owners. Information provided is subject to change without notice. All values are design or typical 

values when measured under laboratory conditions. GE Lighting and GE Lighting Solutions, LLC are businesses of 

the General Electric Company. © 2016 GE. 

 

16-0113 (Rev 3/09/16) 

www.gelighting.com  

Only use the tether provided by GE. If tether is not long enough  
for your installation, please call GE at 

1-800-338-4999 

for a  

free longer tether kit. 

 

 

 

Summary of Contents for LED 165

Page 1: ...rly Follow installation instructions CAUTION CAUTION Risk of injury Wear safety glasses and gloves during installation and servicing Check the ballast information Make sure the ballast is in GE s ballast compatibility list Using with wrong ballast may result in overheat or lamp damage See ballast compatibility list at http www gelighting com led hid ballast compatibility Tools and Components Requi...

Page 2: ...s 3 High Temperature Lock Nuts 1 extra nut is provided for your convenience 1 Tether Kit includes 1 tether wire 2m 1 locker 1 hook Installation Guide LED165 M400 740 Tether Kit Instructions Step 1 Turn off the power Remove the LED lamp from the fixture ...

Page 3: ...over the LED area Step 3 Holding the U shape rod in place slide the steel ring over the base of the lamp and engage the threaded portion of the steel rod Make sure the wings of the steel ring are pointing away from the base Step 4 Feed the provided nuts through the threaded rods on both side of the ring Hand tighten using a nut driver or small socket wrench For reference installation torque betwee...

Page 4: ...g hole on the Steel ring Step6 Screw the LED lamp with the mounted kit into the fixture Step 7 Loop the wire around a load bearing building structure then insert the wire into the other end of the locker WRONG Assembly U shape rod over the LED area Wings of steel ring NOT pointing away from the base ...

Page 5: ...perty of their respective owners Information provided is subject to change without notice All values are design or typical values when measured under laboratory conditions GE Lighting and GE Lighting Solutions LLC are businesses of the General Electric Company 2016 GE 16 0113 Rev 3 09 16 www gelighting com Only use the tether provided by GE If tether is not long enough for your installation please...

Reviews: