2-16
F35 Multiple Feeder Protection System
GE Multilin
2.2 SPECIFICATIONS
2 PRODUCT DESCRIPTION
2
2.2.12 PRODUCTION TESTS
THERMAL
Products go through an environmental test based upon an
Accepted Quality Level (AQL) sampling process.
2.2.13 APPROVALS
APPROVALS
2.2.14 MAINTENANCE
MOUNTING
Attach mounting brackets using 20 inch-pounds (±2 inch-pounds)
of torque.
CLEANING
Normally, cleaning is not required; but for situations where dust
has accumulated on the faceplate display, a dry cloth can be used.
Units that are stored in a de-energized state should be
powered up once per year, for one hour continuously, to
avoid deterioration of electrolytic capacitors.
COMPLIANCE
APPLICABLE
COUNCIL DIRECTIVE
ACCORDING TO
CE compliance
Low voltage directive
EN60255-5
EMC directive
EN60255-26 / EN50263
EN61000-6-5
North America
---
UL508
---
UL1053
---
C22.2 No. 14
NOTE
Summary of Contents for F35
Page 2: ......
Page 4: ......
Page 296: ...5 174 F35 Multiple Feeder Protection System GE Multilin 5 9 TESTING 5 SETTINGS 5 ...
Page 328: ...7 8 F35 Multiple Feeder Protection System GE Multilin 7 2 TARGETS 7 COMMANDS AND TARGETS 7 ...
Page 350: ...A 16 F35 Multiple Feeder Protection System GE Multilin A 1 PARAMETER LIST APPENDIXA A ...
Page 422: ...B 72 F35 Multiple Feeder Protection System GE Multilin B 4 MEMORY MAPPING APPENDIXB B ...
Page 472: ...E 12 F35 Multiple Feeder Protection System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...