3 SETUP AND USE
g
GE Power Management
59
Table 3-4: TRIP/ALARM MESSAGES AND FAULT DIAGNOSIS
/(9(
/
,1)250$7,21 /,1(
(;3/$1$7,21
',$*126,6
5()
SELF-TEST ALARM
A/D H/W FAIL
Problem in A/D circuit detected by
internal self-test. Service
required.
Return relay for service.
SELF-TEST ALARM
RTD H/W FAIL
Problem in RTD circuit detected
by internal self-test. Service
required.
Return relay for service.
SELF-TEST ALARM
RAM FAIL
Problem in RAM detected by
internal self-test. Service
required.
Return relay for service.
1
SELF-TEST ALARM FACTORY
SETPOINTS LOADED
Problem in NOVRAM detected by
internal self-test. Service
required.
Return relay for service.
2
PHASE S/C TRIP
Short Circuit Trip Level exceeded
for a time greater than the Short
Circuit Time Delay.
Check for motor winding shorts.
3
RAPID TRIP
Rapid trip / Mech. Jam Trip Level
exceeded for a time greater than
the Rapid Trip Time Delay.
Check system for jams /
excessive load.
4
SINGLE PHASE TRIP
Unbalance of over 30% present
for a time greater than 4 seconds.
Check continuity of incoming
three phase supply.
5
G/F TRIP
Ground Fault Trip Level exceeded
for a time greater than the
Ground Fault Trip Time Delay.
Check for motor winding to case
or ground shorts. Check motor for
moisture or conductive particles.
OVERLOAD TRIP
LOCKOUT TIME = XXX MIN.
Motor thermal capacity exceeded.
Motor lock-out time is also shown.
Excessive load with motor
running or locked rotor on start.
Wait for motor to cool.
7
START INHIBITED
LOCKOUT TIME = XXX MIN
Insufficient thermal capacity
available for motor to start (i.e.
capacity remaining is less than
Learned Start Capacity).
Wait for motor to cool.
8
U/B TRIP
Unbalance Trip Level exceeded
for a time greater than the
Unbalance Trip Time Delay (all
phases > 0.1 XFLC).
Check incoming supply phases
for unbalance. Check for motor
winding shorts. Increase Trip
Level if required.
9
STATOR RTD TRIP
RTD # X = XXX C
Stator RTD Trip Level
temperature exceeded on at least
one stator RTD.
Check motor ventilation and
ambient temperature. Allow motor
to cool.
10
RTD TRIP
RTD # XX = XXX C
RTD Trip Level temperature
exceeded.
Summary of Contents for 169
Page 12: ......
Page 14: ...2 INSTALLATION g GE Power Management 8 Figure 2 2 CT Dimensions ...
Page 17: ...2 INSTALLATION g GE Power Management 11 Figure 2 4 Relay Wiring Diagram AC control power ...
Page 19: ...2 INSTALLATION g GE Power Management 13 Figure 2 6 Relay Wiring Diagram Two Phase CTs ...
Page 20: ...2 INSTALLATION g GE Power Management 14 Figure 2 7 Relay Wiring Diagram DC Control Power ...
Page 28: ...2 INSTALLATION g GE Power Management 22 Figure 2 10 169 Drawout Relay Physical Dimensions ...
Page 29: ...2 INSTALLATION g GE Power Management 23 Figure 2 11 169 Drawout Relay Mounting ...
Page 31: ...3 SETUP AND USE g GE Power Management 25 Figure 3 1 Front Panel Controls and Indicators ...
Page 73: ...3 SETUP AND USE g GE Power Management 67 Figure 3 2 Standard Overload Curves ...
Page 74: ...3 SETUP AND USE g GE Power Management 68 A B Figure 3 3 Custom Curve Examples ...
Page 88: ...5 THEORY OF OPERATION g GE Power Management 82 Figure 5 1 Hardware Block Diagram ...