Not for
Reproduction
23
Fuel Conversion
The engine of your home generator system is factory
Calibrated and set to operate on natural gas (NG). It may also
be operated on liquefied petroleum (LP) vapor.
To configure the 8 kW fuel system for LP use:
1. Set generator’s system switch to
OFF
.
2. Remove 15 Amp fuse from control panel.
3. Remove roof and side panels.
4. Change main jet in fuel mixer following instructions
provided in LP Conversion Kit.
5. Replace side panels and roof.
6. Reinstall 15 Amp fuse in control panel.
7. Set generator’s system switch to
AUTO
.
The system is now ready to operate automatically using
LP vapor fuel.
To configure 10 kW units with factory installed fuel
harness for LP use:
1. Press control panel “
OFF
” button.
2. Remove 15 Amp fuse from control panel.
3. Remove Roof.
4. Using a slotted screwdriver turn both
C
and
D
screws clockwise until it is snug (Over tightening can
damage mixer port)
5. Using screwdriver turn screw
C
counter clockwise 2
and ½ turns.
6. Leave screw
D
seated.
7. Connect the fuel harness
A
to the engine
solenoid
B
by joining the two-pin electrical
connectors.
8. Reinstall 15 Amp fuse in control panel.
9. Press control panel “
AUTO
” button.
10. Reinstall Roof and Close access panels.
•
NOTE:
NG Settings from factory:
•
Screw C: 4 turns
•
Screw D: 1/2 turn
The system is now ready to operate automatically using
LP vapor fuel.
A
B
D
C
To configure 10 kW units without factory installed fuel
harness for LP use:
1. Press control panel “
OFF
” button.
2. Remove 15 Amp fuse from control panel.
3. Remove Roof.
4. Using a slotted screwdriver turn both
C
and
D
screws clockwise until it is snug (Over tightening can
damage mixer port)
5. Using screwdriver turn screw
C
counter clockwise 2
and ½ turns.
6. Leave screw
D
seated.
7. Reinstall 15 Amp fuse in control panel.
8. Press control panel “
AUTO
” button.
9. Reinstall Roof and Close access panels.
•
NOTE:
NG Settings from factory are:
•
Screw C: 4 turns
•
Screw D: 1/2 turn
Summary of Contents for 40374
Page 10: ...N o t f o r R e p r o d u c t i o n 10 Intentionally Left Blank...
Page 40: ...N o t f o r R e p r o d u c t i o n 40 NOTES...
Page 41: ...N o t f o r R e p r o d u c t i o n 41 Schematic Diagram 10kW Schematic Wiring Diagrams...
Page 42: ...N o t f o r R e p r o d u c t i o n 42 Wiring Diagram 10 kW J12 J19...
Page 43: ...N o t f o r R e p r o d u c t i o n 43 Schematic Diagram 8kW...
Page 54: ...N o t f o r R e p r o d u c t i o n 10 Se dej intencionalmente en blanco...
Page 84: ...N o t f o r R e p r o d u c t i o n 40 Se dej intencionalmente en blanco...
Page 94: ...N o t f o r R e p r o d u c t i o n 10 Laiss en blanc intentionnellement...
Page 124: ...N o t f o r R e p r o d u c t i o n 40 Laiss en blanc intentionnellement...