Table of Contents
Installation Design for Permanent Ajax Compressor Packages
Figure 6-1: Canister Bolt Detail
Preparation of the Foundation and Skid for Grouting
Figure 6-2: Sheave Alignment Procedure
Table 6-1: Grout Compressive Strength Requirement Estimates (for reference only)
Setting an Inertia-Base AJAX Compressor Unit
Figure 6-3: Typical Concrete-filled AJAX Inertia-base Skid
Figure 6-4: Typical Pit Dimensions for Inertia-base Units
Figure 6-5: Recommended Pit Depth and Sand Pad Specification
Setting Inertia-Base Compressor Unit and Cooler:
Figure 6-6: Recommended Sand Placement following Unit Placement
Keyless Flywheel Installation and Ignition Timing
Figure 6-7: Flywheel Cross-Section
Finding TDC and Timing Degree Marks
Setting Timing of the Flywheel
Installation of Sheave and Flywheel
Table 6-2: Screw Tightening Torques, Sheave and Flywheel
Figure 6-8: Flywheel Tolerances
AJAX
®
5