47
*Busway to main bus only, 5000A breaker not available in outdoor non-walk-in construction.
Refer to Table 32.1 and 32.2 for equipment depth options.
NEMA 3R outdoor, non-walk-in — side view and anchoring details
Note: Refer to installation drawing and AKD-10 switchgear installation manual (DEH-194) for additional information