9.4
Health and Safety Declaration Forms
On site service
On Site Service Health &
Safety Declaration Form
Service Ticket #:
To make the mutual protection and safety of GE service personnel and our customers, all equipment and work areas must be
clean and free of any hazardous contaminants before a Service Engineer starts a repair. To avoid delays in the servicing of your
equipment, please complete this checklist and present it to the Service Engineer upon arrival. Equipment and/or work areas
not sufficiently cleaned, accessible and safe for an engineer may lead to delays in servicing the equipment and could be subject to
additional charges.
Yes
No
Please review the actions below and answer “Yes” or “No”.
Provide explanation for any “No” answers in box below.
Instrument has been cleaned of hazardous substances
.
Please rinse tubing or piping, wipe down scanner surfaces, or otherwise ensure removal of any dangerous
residue. Ensure the area around the instrument is clean. If radioactivity has been used, please perform a
wipe test or other suitable survey.
Adequate space and clearance is provided to allow safe access for instrument service, repair or
installation. In some cases this may require customer to move equipment from normal operating location
prior to GE arrival.
Consumables, such as columns or gels, have been removed or isolated from the instrument and from
any area that may impede access to the instrument .
All buffer / waste vessels are labeled.
Excess containers have been removed from the area to provide access.
Provide
explanation
for any “No”
answers here:
Equipment type / Product No:
Serial No:
I hereby confirm that the equipment specified above has been cleaned to remove any hazardous substances and that the
area has been made safe and accessible.
Name:
Company or institution:
Position or
job title:
Date (YYYY/MM/DD):
Signed:
GE and GE monogram are trademarks of General Electric Company.
GE Healthcare Bio-Sciences Corp, 800 Centennial Avenue, P.O. Box 1327, Piscataway,
NJ 08855-1327
© 2010-14 General Electric Company—All rights reserved. First published April 2010.
DOC1149542/
28-9800-26 AC 05/2014
138
Amersham Typhoon Operating Instructions 29193226 AC
9 Reference information
9.4 Health and Safety Declaration Forms