Masoneilan SVi1000 Positioner Quick Start Guide
=
|
39
© 2019 Baker Hughes, a GE company, LLC. All rights reserved.
Overview
This section provides the calibration procedures to ensure proper valve positioning, which
include:
1. “Step 1: Inspect the Actuator, Linkages, or Rotary Adapter” on page
2. “Step 2: Verify Mounting and Linkage Adjustment” on page
3. “Step 3: Checking the Magnet” on page
4. “Step 4: Checking the Air Supply” on page
5. “Step 5: Verify Wiring Connections” on page
6. “Step 6: Configuration” on page
Perform all procedures in this section before putting
the SVi1000 into operation.
NOTE
4. Check Out and
Configuration
Summary of Contents for BAKER HUGHES Masoneilan SVi 1000
Page 1: ...Masoneilan SVi 1000 Positioner Quick Start Guide Rev L BHGE Data Classification Public...
Page 8: ...This page intentionally left blank...
Page 18: ...This page intentionally left blank...
Page 38: ...This page intentionally left blank...
Page 56: ...This page intentionally left blank...
Page 86: ...This page intentionally left blank...
Page 87: ......