Masoneilan SVI FF Instruction Manual
=
|
59
© 2019 Baker Hughes, a GE company, LLC. All rights reserved.
Installing the SVI FF for Double- Acting Operation
This section explains how to mount the SVI FF for the 84/85/86 kit for double-acting valve
positioner configurations.
To mount the kit:
1. Set valve to the closed position.
2. Install the mounting assembly to the yoke (Figure 27) using helical spring washer 5/16, flat
washer 5/16 and hex screw 5/16-18x44.5 [1.75] LG.
Figure 27 85/86 Valve
3. Set rod-ends and brackets to stroke and size of actuator. The default setting is a 4.00”
stroke. Other stroke settings are as in Figure 28.
Figure 28 Stroke Settings
Mount all components snug enough to stay in place but loose
enough to tap with rubber hammer into final position.
Lever
Rod-end
Kit Mount
Bracket
NOTE
Hole A: .50" to .80"
Hole B: 1.00" to 1.50"
Hole C: 2.00" to 2.50"
Hole D: 3.00" to 4.50"
Hole E: 5.00" to 6.00"
Summary of Contents for Baker Hughes Masoneilan SVI FF
Page 12: ...This page intentionally left blank ...
Page 72: ...This page intentionally left blank ...
Page 82: ...This page intentionally left blank ...
Page 94: ...This page intentionally left blank ...
Page 108: ...This page intentionally left blank ...
Page 198: ...This page intentionally left blank ...
Page 206: ...This page intentionally left blank ...
Page 224: ...This page intentionally left blank ...
Page 228: ...This page intentionally left blank ...
Page 230: ...This page intentionally left blank ...
Page 250: ...This page intentionally left blank ...
Page 262: ...This page intentionally left blank ...
Page 263: ......